Air Lter - Mitsubishi Electric M Series Installation Manual

Hide thumbs Also See for M Series:
Table of Contents

Advertisement

Available languages

Available languages

Horizontal Mounting
The unit can be installed on a platform or suspended from rails as
shown below. The rails must run the length of the unit and be of
suf cient strength to support the weight of the unit and connected
ductwork. Vibration isolation is recommended for horizontal
installations. Some jurisdictions may require an auxiliary drain pan
be mounted under the unit. Always follow local or national code
requirements.
Platform Mounting
Suspended Mounting

10. Air lter

A washable (reusable) air lter is provided with the air handler unit.
The lter can be installed once the unit has been removed from
its packaging. It is recommended the air lter be cleaned once per
month.
The pressure drop is to be determined by the installing contractor
based on the overall static pressure performance of the system
including supply and return ductwork sizing. The factory static
pressure performance is 0.50" esp. A eld selectable 0.30 and 0.80
esp. is available. See instructions for changing to 0.30 or 0.80 esp in
the electrical section (13.4.).
AUXILLARY
DRAIN PAN
FILTER
15

Advertisement

Table of Contents
loading

Table of Contents