2.
Unplug the AC adapter and all power and signal cables from the system.
3.
Place the system on a flat, stable surface.
4.
Remove the battery pack.
Disassembly Process
The disassembly process is divided into the following sections:
•
External components disassembly
•
Main unit disassembly
•
LCD module disassembly
The flowcharts provided in the succeeding disassembly sections illustrate the entire disassembly sequence.
Observe the order of the sequence to avoid damage to any of the hardware components. For example, if you
want to remove the Mainboard, you must first remove the Keyboard, and LCD Module then disassemble the
inside assembly frame in that order.
Main Screw List
Screw
M2*2.5 (silver)
M3*3.5 (silver)
M2*3
M2*4
M2*5
M2*8
M2-0.4.5*2 FH
External Module Disassembly Process
NOTE: The product previews seen in the disassembly procedures may not represent the final product color or
configuration.
40
Quantity
5
4
18
1
16
5
2
Part Number
86.TPK07.001
86.TDY07.003
86.S0207.001
86.W0107.003
86.TG607.004
86.FRC07.001
86.W4107.002
Chapter 3