Download Print this page

Sealey FGE01 Instructions Manual page 5

2.5 x 4.5 x 2.5m foldable steel garage extension

Advertisement

fig.7
5.8.
STEP 5 (FIG.8)
5.8.1.
Move the wheels close to the centre to take the tension out of the whole structure, then put the cover (fig.8.19) onto the whole frame,
and then pull the whole structure tight.
5.8.2.
Walk around the whole structure, pull the cover tight, and then hook the cover into the suitable hole on the tube legs.
5.8.3.
Pull the cover tight onto the frame. Use the 'hook and loop tape' straps sewn on the cover to secure it (fig.9).
© Jack Sealey Limited
Original Language Version
fig.8
fig.9
FGE01 Issue 1 25/11/2020

Advertisement

loading

This manual is also suitable for:

5054511915136