GE AET05LY Owner's Manual And Installation Instructions page 10

Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions
4. PREPARE THE AIR
CONDITIONER (cont.)
C.
Remove the backing from the accordion seal
(two short strips). Stick one sealing strip
respectively on the left side and right side of
the accordion panels, as shown.
D.
Slide the free end of the accordion panel into
the side panel rails. Slide the panel down. Be
sure to leave enough space to slip the top
and bottom of the frame into the rails on the
cabinet.
NOTE: There is a right and a left accordion
panel. Be sure to use the proper panel for each
side.
Top mounting rail
E. Slide the left and right accordion panels into the
top and bottom mounting rails.
Top left
10
Bottom
mounting rail
Top mounting rail
Top right
5 PREPARE THE WINDOW
Cut the window seal (2 long strips) to the proper
length. Peel off the backing and attach the seal
to the underside of the window sash.
(with adhesive)
6. INSTALL THE AIR CONDITIONER
IN THE WINDOW
A.
Place the air conditioner on the sill with the
bottom mounting rail against its back edge.
Center it and close the window securely behind
the top mounting rail. It should be level or
a 1/3 bubble will be the correct case slant to
the outside.
Type B screws
B.
Extend the left and right accordion panels to
the vertical window sashes and attach, through
the holes in the panels, with 5 Type B screws,
as appropriate.
Sealing Strip
49-5000086

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Aet05

Table of Contents