Hitachi DS7000 Installation Manual
Hide thumbs Also See for DS7000:

Advertisement

Quick Links

Hitachi Advanced Server DS7000
Installation Guide
This document explains how to install a Hitachi Advanced Server DS7000 series
scalable server for the first time.
MK-97HAS7013-04
November 2021

Advertisement

Table of Contents
loading

Summary of Contents for Hitachi DS7000

  • Page 1 Hitachi Advanced Server DS7000 Installation Guide This document explains how to install a Hitachi Advanced Server DS7000 series scalable server for the first time. MK-97HAS7013-04 November 2021...
  • Page 2 Hitachi reserves the right to make changes to this Material at any time without notice and assumes no responsibility for its use. The Materials contain the most current information available at the time of publication.
  • Page 3: Table Of Contents

    ......2-20 2.4.1. Installing the Rails for the Hitachi Advanced Server DS7080 Assemblies . 2-20 2.4.2.
  • Page 4: Preface

    Preface About this Document This document explains how to install a Hitachi Advanced Server DS7000 series scalable server for the first time. Important ATTENTION: Please read carefully the safety instructions before you perform the procedures described in this manual. Multilingual Safety Notices Guide...
  • Page 5: Getting Help

    Getting Help Hitachi Vantara Support Connect is the destination for technical support of products and solutions sold by Hitachi Vantara. To contact technical support, log on to Hitachi Vantara Support Connect for contact information: https://support.hitachivantara.com/en_us/contact-us.html Hitachi Vantara Community is a global online community for customers, partners, independent software vendors, employees, and prospects.
  • Page 6: Chapter 1. Checking The Delivery Contents

    Chapter 1. Checking the Delivery Contents Important ATTENTION: Please read carefully the safety instructions before you perform the procedures described in this manual. Multilingual Safety Notices Guide 1.1. Unpacking the Server Important Before unpacking the server inspect the server packaging for damage.
  • Page 7: Identifying The Server

    1.2.1. Identifying the Server Model The server model is provided on the safety label on the side of the server. Model Name Commercial Name M3S2G2 Hitachi Advanced Server DS7020 M3S2G4 Hitachi Advanced Server DS7040 M3S2G8 Hitachi Advanced Server DS7080 M3XU16 UBox 1.2.2.
  • Page 8 Slave Label Example Front view A label is also available at the front, behind the bezel. Chapter 1. Checking the Delivery Contents...
  • Page 9: Checking Safety Labels

    1.3. Checking Safety Labels Safety warning labels, including safety notices and graphic symbols, are visible on the server. Check that the electrical installation in place complies with the label details. 1.3.1. Server Module Labels Server Identification Label The label is located on the side of the server. Mark Description Certification information...
  • Page 10 W071 WARNING W071: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference and (2) this device must accept any interference received including interference that may cause undesired operation Server Module Identification Label Rear view The label is located inside a little drawer.
  • Page 11: Ubox Labels

    1.3.2. UBox Labels Identification label for the UBox The label is located on the side of the server. Mark Description Recycling symbol: it is mandatory to reuse and recycle electronic and electrical equipment properly Electric hazard symbol: Caution! Risk of electric shock Multiple power sources symbol: Caution! The system has more than one power source which must all be disconnected before servicing to avoid shock hazard...
  • Page 12 UBox Onboard Battery Label C003 CAUTION C003: The onboard battery should be replaced regularly. It must be replaced with the same or an equivalent type recommended by the manufacturer. There is a danger of explosion if another type is used. Dispose of used batteries according to the manufacturer's instructions UBox Power Supply Unit (PSU) Label The label is located at the rear of the UBox.
  • Page 13: Chapter 2. Installing The Server In The Rack Cabinet

    Chapter 2. Installing the Server in the Rack Cabinet 2.1. Installing a Hitachi Advanced Server DS7020 D013 DANGER D013: The server weighs 40 kg when fully populated. Two people are required to unpack it and install it in the cabinet.
  • Page 14 Procedure 1. Prepare the rails 1. Loosen the screws of each rail. Installation Guide...
  • Page 15 2. Adjust the length of each rail. 3. Tighten the screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 16 2. From the front, install the left rail Installation Guide...
  • Page 17 3. From the front, install the right rail Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 18 4. From the front, install the server Insert the server using the guiding pins. 5. Secure the server in place 1. Push the server until it stops. 2. Tighten both captive screws. Front view Installation Guide...
  • Page 19: Installing A Hitachi Advanced Server Ds7040

    2.2. Installing a Hitachi Advanced Server DS7040 D047 DANGER D047: The server weighs 80 kg when fully populated. Important The server is delivered fully populated. It is mandatory to use a lifting device to install it. However, it is possible to reduce the server weight by removing the components from the compute box.
  • Page 20 2. Adjust the length of each rail. 3. Tighten the screws of each rail. Installation Guide...
  • Page 21 2. From the front, install the left rail Chapter 2. Installing the Server in the Rack Cabinet...
  • Page 22 3. From the front, install the right rail 2-10 Installation Guide...
  • Page 23 4. From the front, install the server Chapter 2. Installing the Server in the Rack Cabinet 2-11...
  • Page 24 5. Secure the server in place 1. Push the server until it stops. 2. Tighten the four captive screws. Front view 2-12 Installation Guide...
  • Page 25: Installing A Hitachi Advanced Server Ds7080

    2.3. Installing a Hitachi Advanced Server DS7080 D048 DANGER D048: The server weighs 160 kg when fully populated. Important The server is delivered fully populated. It is mandatory to use a lifting device to install it. However, it is possible to reduce the server weight by removing the components from the compute box.
  • Page 26 2. Adjust the length of each rail. 3. Tighten the screws of each rail. 2-14 Installation Guide...
  • Page 27 2. From the front, install the left rail Chapter 2. Installing the Server in the Rack Cabinet 2-15...
  • Page 28 3. From the front, install the right rail 2-16 Installation Guide...
  • Page 29 4. Install the server 1. Insert the server into the rack cabinet. Chapter 2. Installing the Server in the Rack Cabinet 2-17...
  • Page 30 2. Push the server until the front face is 5 cm from the rack cabinet edge. 3. Insert two cage nuts in the rack cabinet frames for the upper server screws. 4. Push the server until it stops. 2-18 Installation Guide...
  • Page 31 5. Secure the server into place Tighten the four captive screws. Chapter 2. Installing the Server in the Rack Cabinet 2-19...
  • Page 32: Installing A Hitachi Advanced Server Ds7160

    Appendix B Nuts, Screws and Washers 2.4.1. Installing the Rails for the Hitachi Advanced Server DS7080 Assemblies Note There are two types of rails: one for the Hitachi Advanced server DS7080 assemblies and one for the Ubox(es). 2-20 Installation Guide...
  • Page 33 Procedure 1. Prepare the rails 1. Loosen the screws of each rail. Chapter 2. Installing the Server in the Rack Cabinet 2-21...
  • Page 34 2. Adjust the length of each rail. 3. Tighten the screws of each rail. 2-22 Installation Guide...
  • Page 35 2. From the front, install one left rail at the bottom of the rack (rack slot 1) Chapter 2. Installing the Server in the Rack Cabinet 2-23...
  • Page 36 3. From the front, install one right rail at the bottom of the rack (rack slot 1) 2-24 Installation Guide...
  • Page 37 4. From the front, install the second left rail at the rack slot 14 Perform the same operations as when installing the first rail. Chapter 2. Installing the Server in the Rack Cabinet 2-25...
  • Page 38 5. From the front, install the second right rail at the rack slot 14 Perform the same operations as when installing the first rail. 2-26 Installation Guide...
  • Page 39: Installing The Rails For The Ubox(Es)

    2.4.2. Installing the Rails for the Ubox(es) Note There are two types of rails: one for the Hitachi Advanced server DS7080 assemblies and one for the Ubox(es). Procedure 1. Prepare the rails 1. Loosen the screws of each rail. 2. Adjust the length of each rail.
  • Page 40 3. Tighten the screws of each rail. 2-28 Installation Guide...
  • Page 41 2. From the front, install the left rail at the rack slot 9 Chapter 2. Installing the Server in the Rack Cabinet 2-29...
  • Page 42 3. From the front, install the right rail at the rack slot 9 2-30 Installation Guide...
  • Page 43: Installing All The Chassis

    2.4.3. Installing all the Chassis Procedure 1. Install the first Hitachi Advanced Server DS7080 assembly at the bottom of the rack 1. Insert the assembly into the rack cabinet. Chapter 2. Installing the Server in the Rack Cabinet 2-31...
  • Page 44 2. Push the server until the front face is 5 cm from the rack cabinet edge. 3. Insert two cage nuts in the rack cabinet frames for the upper server screws. 4. Push the server until it stops. 2-32 Installation Guide...
  • Page 45 2. Secure the server into place Tighten the four captive screws. Chapter 2. Installing the Server in the Rack Cabinet 2-33...
  • Page 46 3. Install the empty UBox at the rack slot 9 1. Insert the UBox into the rack cabinet. 2. Push the UBox until it stops. 4. Secure the UBox in place Tighten the four captive screws. 2-34 Installation Guide...
  • Page 47 5. Install the second Hitachi Advanced Server DS7080 assembly at the rack slot 14 Perform the same operations as when installing the bottom assembly. Chapter 2. Installing the Server in the Rack Cabinet 2-35...
  • Page 48 6. Install the UBox alignment brackets The alignment brackets are used to fix the UBox to the Hitachi Advanced Server DS7080 assemblies. Rear view 1. If present, remove the top and bottom PSUs on the left-hand side of the UBox.
  • Page 49 2. Position the alignment brackets using the guide pin. 3. Tighten the screws. Chapter 2. Installing the Server in the Rack Cabinet 2-37...
  • Page 50 4. If required, install the top and bottom PSUs on the left-hand side of the UBox. 2-38 Installation Guide...
  • Page 51: Installing The 8-Module Connecting Box

    2.4.4. Installing the 8-Module Connecting Box Procedure 1. Take hold of the new component 2. Remove the cover from the 8-module connecting box 1. Loosen the fixing pins (A) and the captive screws (B). Chapter 2. Installing the Server in the Rack Cabinet 2-39...
  • Page 52 2. Remove the cover using the handles (C). 2-40 Installation Guide...
  • Page 53 3. Partially insert the 8-module connecting box into its location Watch out for the position of the 8-module connecting box. Rear view Chapter 2. Installing the Server in the Rack Cabinet 2-41...
  • Page 54 4. Remove the shipping brackets Four brackets are installed for shipment and must be removed. 1. Loosen the captive screws. 2-42 Installation Guide...
  • Page 55 2. Remove the brackets. Chapter 2. Installing the Server in the Rack Cabinet 2-43...
  • Page 56 5. Secure the 8-module connecting box in place 1. Push the 8-module connecting box completely in. 2-44 Installation Guide...
  • Page 57 2. Tighten the captive screws (A) and fixing pins (B). Chapter 2. Installing the Server in the Rack Cabinet 2-45...
  • Page 58 6. Install the cover 1. Install the cover using the handles (C). 2. Secure the cover in place by tightening the fixing pins (A) and the captive screws (B). 2-46 Installation Guide...
  • Page 59 7. Install all the UBox PSUs For each UBox PSU, perform the following steps: 1. Check the UBox PSU position Look at the label inside the PSU slot. 2. Press the latch of the UBox PSU 3. Push the UBox PSU in using the handle 4.
  • Page 60: Installing The Ubox Components

    2.4.5. Installing the UBox Components Procedure 1. Take hold of the new component. 2. Install all the UNB modules For each UNB module, perform the following steps: 1. Check the handles of the UNB module are in the open position. 2.
  • Page 61 4. Tighten the handle captive screws. 3. Install all the SCI modules For each SCI module, perform the following steps: 1. Check the handle of the SCI module is in the open position 2. Insert the SCI module and push it completely 3.
  • Page 62 4. Tighten the captive screw on the handle 4. Install the LMB module 1. Check the handles of the LMB module are in the open position 2. Insert the LMB module and push it completely 3. Close the handles 4. Tighten the captive screw on the handles 2-50 Installation Guide...
  • Page 63 5. Install the CLKB modules For each CLKB module perform the following steps: 1. Insert the CLKB module 2. Push it completely 6. Install all the UNB fan modules For each UNB fan module, perform the following steps: Insert the UNB fan module and push it completely in using the handle. Chapter 2.
  • Page 64 7. Install the UBox bezel 1. Position the bezel. 2. Check the pilot pin (B) is aligned with the hole (c ). 3. Tighten the captive screws (A). 2-52 Installation Guide...
  • Page 65: Appendix A. Installing A Lightened Server

    Appendix A. Installing a Lightened Server D048 DANGER D048: The server weighs 160 kg when fully populated. The server is delivered fully populated. It is possible to reduce the server weight by removing the components from the compute box. However it is mandatory to use a lifting device.
  • Page 66 4. Pull the main box out of the compute box by the handles. 3. Unlock the latch of the PCIe blade 4. Take hold of the handle and carefully remove the PCIe blade Installation Guide...
  • Page 67 5. Pull the latch of the PSU up 6. Take hold of the handle and carefully remove the PSU Appendix A. Installing a Lightened Server...
  • Page 68: Installing The Compute Box In The Rack Cabinet

    A.2. Installing the Compute Box in the Rack Cabinet Proceed in the same way as for the fully populated server. It is mandatory to use a lifting device. 1. From the front, install the compute box 2. Secure the compute box in place by tightening the captive screws Installation Guide...
  • Page 69: Installing The Components Into The Compute Box

    A.3. Installing the Components into the Compute Box 1. Carefully install the main boxes, all the PCIe blades and the PSUs 2. From the front, insert the main box into the compute box 3. Secure the main box in place 1.
  • Page 70 2. Tighten both captive screws. 4. Install the PSUs at the rear 1. Look at the labels on the PSU slot sides to check the PSU positions. Installation Guide...
  • Page 71 2. Position a PSU in the slot on the left hand side with the latch (B) at the bottom. Rear view 3. Take hold of the PSU by the handle (A). 4. Push the PSU using the handle (A) until the latch (B) locks. 5.
  • Page 72 7. Push the PSU using the handle (A) until the latch (B) locks. 5. Locate all the PCIe blades slots for a module Rear view 6. Install all the PCIe blades For all PCIe blades: 1. Unlock the latch. Installation Guide...
  • Page 73 2. Insert the PCIe blade into the compute box using the handle. 3. Check that the latch is closed. Appendix A. Installing a Lightened Server...
  • Page 74: Appendix B. Nuts, Screws And Washers

    Appendix B. Nuts, Screws and Washers This appendix describes all nuts, screws and washers included in the delivery. Screws Mark Head Body Diameter Length Description 5 mm 16 mm M5x16 CBL head thread forming screw 4 mm 10 mm M4x10 SS Flat-head socket cap screw 4 mm 10 mm M4x10 Low Profile SS head cap screw Washers...
  • Page 75 Hitachi Vantara Corporate Headquarters 2535 Augustine Drive Santa Clara, CA 95054 USA www.HitachiVantara.com community.HitachiVantara.com Regional Contact Information Americas: +1 866 374 5822 or info@hitachivantara.com Europe, Middle East and Africa: +44 (0) 1753 618000 or info.emea@hitachivantara.com Asia Pacific: +852 3189 7900 or info.marketing.apac@hitachivantara.com...

Table of Contents