Appearance/Dimension/Interface; Installation And Debugging - Haier YCS-A001 Manual

Weekly timer
Hide thumbs Also See for YCS-A001:
Table of Contents

Advertisement

Appearance/Dimension/Interface

Installation and Debugging

1. The long-distance monitoring system group control network (hereinafter abbreviated
as group control network) of Haier Commercial Air Conditioner must establish, from
its design plan, installation and debugging to after-sale-service, a complete set of
documents (group control network programming, installation record, debugging record
and repair and maintenance record) and keep in the archives for future use.
2. The programming of group control network needs to finish the following works in
advance, including: (1) Composition of group control network system and control
number; (2) Choose the model of air conditioner, installation position, power distribution
and wiring treatment and connection with detector;
PROGRAM NO.
1
2
3
4
SET 1 ON
SET 2 ON
1
2
3
4
NO.
ON.
1
2
3
14
RS-485
B
A 12VDC
O
5
6
7
Program
Holiday
Number
OFF
Hour
Cancel
OFF
Min.
Confirm
5
6
7
Time
Week
4

Advertisement

Table of Contents
loading

Table of Contents