Technical Data - GE ETS19 P Series Technical Service Manual

Table of Contents

Advertisement

https://appliancetechmanuals.com
ELECTRICAL SPECIFICATIONS
Temperature Control (Position 5)....................24.5-12.5°F
Defrost Control ......................................... 8 hrs @ 30 min
Defrost Thermostat .............................................58-28°F
Electrical Rating: 115V AC 60Hz
100V AC 50 Hz .............................................. 6.5 Amp
Maximum Current Leakage ............................... 0.75 mA
Maximum Ground Path Resistance ................0.14 Ohms
Energy Consumption
18' ............................................................40 KWH/mo
19' ............................................................41 KWH/mo
NO LOAD PERFORMANCE
Control Position, Fresh Food 5, Freezer 5
and Ambient Temperature of: ....................70°F
Fresh Food, °F ......................................... 34-40
Frozen Food, °F ...................................... (-3) -4
Run Time, % ........................................................... 20-30
Note: At the temperature control position of
Fresh Food 5, Freezer 5, approximately 90% of
the airflow is distributed in the freezer, 10% in the
Fresh Food.

Technical Data

90°F
35-39
(-3) -3
41-53
AIR FLOW
FAN
EVAPORATOR
DAMPER
COLD AIR
MIXED AIR
WARMER AIR
Evaporator Fan
Blade Location
0.35"
– 4 –
REFRIGERATION SYSTEM
Refrigerant Charge (R134a) ............Refer to Rating Plate
Compressor .................................................. 685 BTU/hr
Minimum Compressor Capacity........................19 inches
Minimum Equalized Pressure
@70°F............................................................ 52 PSIG
@90°F............................................................ 66 PSIG
REPLACEMENT PARTS
Condenser Fan Motor .................................WR60X10044
Evaporator Fan Motor..................................WR60X10057
Defrost Heater ............................................ WR51X10031
Relay.............................................................WR07X0194
Overload .....................................................WR08X10046
Temperature Control ...................................WR09X10044
Defrost Thermostat .....................................WR50X10025
Capacitor.......................................................WR62X0080
INSTALLATION
Clearance must be provided for air circulation
AT TOP..................................................................1-inch
AT SIDES............................................................1/8-inch
AT REAR................................................................1-inch
SEALED SYSTEM
T
CONDENSER
LOOP
PROCESS
TUBE
DRYER
103-02A
Condenser Fan
Blade Location
0.2"

Advertisement

Table of Contents
loading

Table of Contents