ABB SACE Emax 2 Installation, Operation And Maintenance Instructions page 55

Table of Contents

Advertisement

53 | © 2021 ABB | 1SDH002083A1002 - ECN000119014 - Rev. A
Continued from the previous page
6.
Remove the front cover of the circuit-breaker (e) by removing the screws (f) and the protection plate
(g) by removing the screw (h).
Figure 77 - Disassembly of the escutcheon plate
Figure 78 - Disassembly of the protection plate
Before cleaning and lubrication of the operating mechanism, you must remove the protection trip unit. For
information about removal, see the document 1SDH001000R0523, or request the intervention of a technician
ABB.
F
E
G
H
Putting into service and maintenance | 5 - Second level maintenance
ABB | SACE Emax 2

Advertisement

Table of Contents
loading

Table of Contents