Installation & Operation Manual
Note: If the pump has been stopped via the Start/Stop
button, the pump will not run until the pump is turned back
on by the Start/Stop button. If the Start/Stop LED is
illuminated then the pump is on and will run the programmed
schedule.

4.5 Speed Priorities

For schedule duration settings, SPEEDS are prioritized as
follows: SPEED 1 -> SPEED 2 -> SPEED 3 -> SPEED 4.
SPEED 1 is the highest priority, while SPEED 4 is the
lowest. The drive will not allow a user to program a schedule
of more than 24 hours. When the 24th hour of duration is
programmed it will take time from the lower priority speeds
in order to add them to the SPEED currently being adjusted.
Example:
Starting Schedule (Before Adjustment)
SPEED 1 duration = 18 hours
SPEED 2 duration = 2 hours
SPEED 3 duration = 2 hours
If the user reprograms SPEED 1 to run for
22 hours, SPEED 2 (lower priority speed) will
automatically adjust to a 1 hour duration and
SPEED 4 (lowest priority speed) will adjust to a
0 hour duration.
End Schedule (After Adjustment)
SPEED 1 duration = 22 hours
SPEED 2 duration = 1 hour
SPEED 3 duration = 1 hours
SPEED 4 duration = 0 hours
ENGLISH

4.6 Operating the Pump While Running

If power is connected to the pump motor, pressing any of the
following buttons referred to in this section could result in the
motor starting. Failure to recognize this could result in personal
injury or damage to equipment.
Pressing the Display button will cycle through the
current parameters:
• Speed — current run speed
• Time — current time of day
• Duration — amount of time remaining at the current
run speed
• Watts — amount of watts currently being consumed
Pressing any of the Speed Buttons ("1", "2", "3", "4",
"Quick Clean") while the pump is running will act as
temporary override. It will run the speed and duration
that is programmed for that button. Once completed
it will default back to the appropriate point in the
programmed schedule.
Note: If you adjust the speeds of the schedule while
the pump is running, it will run the adjusted speed
for the rest of the current duration, but will not save
the adjustments.