Download Print this page
Toro Trans Pro 100 Installation Instructions

Toro Trans Pro 100 Installation Instructions

18in rail conversion kit

Advertisement

Quick Links

18in Rail Conversion Kit
Trans Pro 100
Model No. 110-7345
WARNING
CALIFORNIA
Proposition 65 Warning
This product contains a chemical
or chemicals known to the State of
California to cause cancer, birth defects,
or reproductive harm.
The engine exhaust from this product
contains chemicals known to the State of
California to cause cancer, birth defects,
or other reproductive harm.
1. Tube assembly
2. Cross tube
3. Load ramp
4. Spacer
4.
Remove the cap screw and nut securing the
trailer stop to each side of trailer
5.
Remove the 4 carriage bolts, flat washers, and
locknuts securing the tube assembly mounting
brackets to each side of the trailer
6.
Remove the wheel rods and brackets from each
side of trailer
(Figure
© 2017—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
(Figure
1).
(Figure
1).
1).
Register at www.Toro.com.
Note:
Retain all removed components and fasteners
unless otherwise specified.
Important:
If your machine has a groomer
installed, you must equip the machine with the
Extended Axle Kit (Part No. 136-7287) to ensure a
proper fit with the trailer.
1.
Unlock and lower the trailer ramp.
2.
Remove the cap screw (3/8 x 2-1/2 inch), spacer,
washer, and locknut securing a load ramp to the
rear of each tube assembly
3.
Remove the flange-head screws (5/16 x 3/4
inch) and flange nuts securing each locking
bracket to the ramp
Figure 1
5. Trailer stop
6. Locking bracket
7. Wheel rod
7.
Install each tube assembly to a trailer side with
4 wall stiffeners, 4 carriage bolts (3/8 x 2-1/4
inches), 2 spacers and 2 locknuts
Position the tube assemblies so that the small
cross tubes are to the rear.
Important:
If your machine is equipped with
a groomer, install the spacers only on the
Original Instructions (EN)
All Rights Reserved *3416-234* A
Printed in the USA
Form No. 3416-234 Rev A
Installation Instructions
(Figure
1).
(Figure
1)
(Figure
g217629
2).

Advertisement

loading

Summary of Contents for Toro Trans Pro 100

  • Page 1 Form No. 3416-234 Rev A 18in Rail Conversion Kit Trans Pro 100 Model No. 110-7345 Installation Instructions Note: Retain all removed components and fasteners WARNING unless otherwise specified. CALIFORNIA Important: If your machine has a groomer Proposition 65 Warning installed, you must equip the machine with the Extended Axle Kit (Part No.
  • Page 2 right side of the trailer; the left tube assembly Mount a load ramp to the rear of each tube must connect directly to the trailer wall. assembly with a cap screw (3/6-16 x 2-1/2 inches), spacer, washer, and locknut (Figure Install the trailer stops and new spacers to the front of the tube assemblies with the cap screws Position a locking bracket onto each side of...
  • Page 3 Loosely mount each locking bracket to the ramp with flange-head screws (5/16-18 x 3/4 inch) and flange nuts (Figure 1 Figure g217627 Figure 3 1. Load ramps 3. Ramp 2. Locking bracket Raise and lock the ramp. Adjust the locking brackets so that they are engaged on the pins, and tighten the flange screws and nuts (Figure 1...

This manual is also suitable for:

110-7345