Checking the installation equipment

Table 3 presents a list of the tools and other equipment required for upgrading a
Nokia MetroSite BTS.
Table 3.
Part
Laptop PC
LMP cable
Torque driver with 60 mm (2.4 in) shaft
and:
Torque key
Cable ties and side cutting pliers
ESD wrist strap
2.6

Removing the BTS cover

Before removing the cover of the BTS, refer to the information on power supply
precautions and environmental conditions on the site, presented earlier in this
chapter.
Note
Removing the cover issues an alarm to the BSC. Make sure that the BSC/NMS
personnel is notified before removing the cover.
DN00187365
© Nokia Corporation
Issue 2-0 en
Nokia Proprietary and Confidential
Rain or snow must not be allowed to fall on the internal surfaces of the
equipment.
The cover must not be removed during conditions where dust can be blown
into the cabinet.
Tools and other equipment required for a field upgrade
T10 and T25 Torx bits
4 mm Allen bit
Notes
The PC should be compatible with Nokia
SiteWizard software version 3.0.
For connecting BTS Manager software
to the BTS via the LMP port on the
interface unit
Required for:
Unit retaining screws
Cable entry block screws
For attaching diversity cables
For securing cable routing out of the BTS
To prevent electro-static discharge
damage