Installation; Installation Requirements; General Operating Conditions; Transport - Miele PDR 514 Operating And Installation Instructions

Commercial tumble dryers
Table of Contents

Advertisement

Installation

Installation requirements

The tumble dryer must only be installed and commissioned by the Miele Professional
Service Department or an authorised technician.
The tumble dryer must be installed in accordance with all relevant regulations and
standards.
The dryer must only be operated in a room that has sufficient ventilation and which is
frost-free.

General operating conditions

This dryer is intended only for use in a commercial environment and must only be
operated indoors.
Do not install the tumble dryer in a room where there is a risk of frost.
Depending on the nature of the installation site, sound emissions and vibration may occur.
Useful tip: Have the installation site inspected and seek the advice of a professional in
instances where increased noise may cause a nuisance.

Transport

The tumble dryer must not be transported without a transport pallet.
Suitable transport aids must always be used during transportation.
At the installation site, the tumble dryer must be lifted from the transport pallet using
suitable lifting gear.

Installing the tumble dryer

Place the tumble dryer on a perfectly level, secure, and horizontal surface that is able to
withstand the specified floor load.
The floor load created by the tumble dryer is concentrated and transferred to the
installation surface via the adjustable feet. A base is not required. However, an uneven
floor surface must be compensated for.
30

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 518Pdr 522Pdr 528Pdr 544

Table of Contents