Cooling Tower Applied Method - LG multi V ARWB Series Installation Manual

Hide thumbs Also See for multi V ARWB Series:
Table of Contents

Advertisement

In case the concentration exceeds the limit
When the concentration exceeds the limit, change original plan or take
one of the countermeasures shown below:
• Countermeasure 1
Provide opening for ventilation.
Provide 0.15% or more opening to floor space both above and below
door, or provide opening without door.
• Countermeasure 2
Provide gas leak alarm linked with mechanical ventilator.
Reducing the outside unit refrigerant qty.
Gas leak alarm
Countermeasure 2
Mechanical ventilator
Indoor unit
Pay a special attention to the place, such as a basement, etc.
where refrigerant can stay, since refrigerant is heavier than air.
COOLING TOWER APPLIED
METHOD
Open type
cooling tower
1
st
side
Heat exchange
[Open type cooling tower + Middle heat exchanger]
Heat exchanger is installed between the cooling tower and outside
unit system piping, and the temperature difference between 1st side
and 2nd side is maintained constantly.
Countermeasure 1 Opening effective to ventilation
2
nd
side
Closed type
cooling tower
CAUTION
!
When the open type cooling tower is used and the water supply is
directly connected to the 2nd heat exchanger, product damage by
alien particle cannot be repaired for free.
- Always use the 2nd heat exchanger.
WATER SOLENOID VALVE CON-
TROL
Central Control(Use DDC Port)
Water
CN_18
Water
(220 V Out)
In
Out
Solenoid
1(L) 2(N) 3(L) 4(N)
Valve
※ BMS : Building Management System
Individual Control(Use 220V Output Port)
CN_18
Water
Water
(220 V Out)
In
Out
Solenoid
1(L) 2(N) 3(L) 4(N)
Valve
※ Refer to setting the function and turn on the power
When you individual control for water solenoid valve
control.
43
CN_22
Main PCB
(to DDC)
PI 485
BMS
DDC
CN_22
Main PCB
(to DDC)