THERMISTORS INSTALLATION

Pipe thermistors Installation

Location of the pipe thermistors
A correct installation of the thermistors is required to ensure a good operation :
1
Pipe_In(EBG61287703)
: Install the thermistor behind the distributor on the coldest pass the heat exchanger
(contact your heat exchanger dealer).
2
Pipe_Out(EBG61287704)
: Install the thermistor at the outlet of the heat exchanger as close as possible to the heat
exchanger.
Evaluation must be done to check if the evaporator is protected against freeze-up.
Execute test operation and check for freeze-up.
1
Pipe_In(Suction pipe)
2
Pipe_Out(Discharge pipe)
THERMISTORS INSTALLATION
(AHU)
1
2
31