How to Check this Installation Procedure
When Using the Parts Included in the Package
A symbol is described on the illustration in the case of using the parts included in the package
of this product.
Packaged Item
Symbols in the Illustration
The frequently-performed operations are described with symbols in this procedure.
Screw
Connector
Tighten
Remove
Connect
Claw
Insert
Remove
Push
Checking instruction
Check
Visual Check
Sound Check
6
Installation > Points to Note at Installation
Installation
F-6-1
Harness
Disconnect
Secure
Free
Plug in
Turn on
F-6-2
6
Installation > Points to Note at Installation
Installation
Product Name
Safety regulations require the product's name to be registered. In some regions where this
product is sold, the following name may be registered instead.
• F630812
Check Item when Turning OFF the Main Power
Check that the main power switch is OFF.
1) Turn OFF the main power switch of the host machine.
2) Be sure that Control Panel Display and Main Power Lamp are both turned OFF, and then
disconnect the power plug.
Installation Outline Drawing
Points to Note at Installation
Install this equipment after installing the Super G3 FAX Board.
6-2
F-6-3
6-2