Download Print this page
Huawei SUN2000P-450W-P Quick Manual

Huawei SUN2000P-450W-P Quick Manual

Smart pv optimizer

Advertisement

Quick Links

SUN2000-450W-P Smart PV Optimizer
Quick Guide
Issue: 03
Part Number: 31500AYH
Date: 2020-08-16
1
Product Overview
The Smart PV Optimizer is a DC-DC converter installed on the rear of PV modules in a PV
system. It manages the maximum power point (MPP) of each PV module to improve the energy
yield of the PV system, and performs functions such as module-level shutdown and module-level
management.
2
Installing the Optimizer
Properly plan the installation position of optimizers to ensure that the cables between the
optimizer and the PV module and between adjacent optimizers can be properly connected, and
the maximum communication distance between the optimizer and the solar inverter is within
350 m.
1. After determining the installation position of the optimizer, remove and attach the SN label.
or
2. Install the optimizer based on the selected installation mode.
Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.
Mountin
g
bracket
Type II
apparatus
(enhanced
insulation)
1 1
Burn
Electric
warning
shock
warning

Advertisement

loading

Summary of Contents for Huawei SUN2000P-450W-P

  • Page 1 Issue: 03 Part Number: 31500AYH Date: 2020-08-16 Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved. Product Overview The Smart PV Optimizer is a DC-DC converter installed on the rear of PV modules in a PV system. It manages the maximum power point (MPP) of each PV module to improve the energy yield of the PV system, and performs functions such as module-level shutdown and module-level management.
  • Page 2 M8x20 T-shaped bolt Prepare the bolt and nut by yourself.  The T-shaped bolt and nut can be  purchased from Huawei. The following shows the bolt dimensions. Purchase the bolt based on the extruded aluminum profile. PV module M8x20 bolt assembly...
  • Page 3 Purchase the frame mounting  bracket separately from Huawei. Install the PV module after the  optimizer is installed. The front of the optimizer should be at least 10 mm away from the rear of the PV module.
  • Page 4 Common Exception Scenarios The probes are The sunlight is weak: reversely connected. 1.1 kΩ < R1 The measured value R2 is less than the resistance measured when the probes are correctly connected. The optimizer input The optimizer is not connected: output is connected 1.1 kΩ...
  • Page 5: Power-On Commissioning

    You can scan the QR FusionSolar App Quick Guide code to obtain Troubleshooting 1. Open the FusionSolar app, log in to intl.fusionsolar.huawei.co m using the installer account, choose My > Device Commissioning, and connect to the WLAN hotspot of the Optimizer status solar inverter.
  • Page 6 Replacing an Optimizer 1. Power off the solar inverter and remove 2. Install a new optimizer and correctly the faulty optimizer. connect its cables. 3. Power on the solar inverter. On the Device 4. On the Device Commissioning screen, Commissioning screen, choose choose Maintenance >...
  • Page 7 Carefully read this document prior to installation to get familiar with product information  and safety precautions. Huawei shall not be liable for any consequence caused by violation of the storage, installation, and operation regulations specified in this document and the solar inverter user manual.
  • Page 8 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129, People's Republic of China solar.huawei.com...

This manual is also suitable for:

31500ayh