6
Installing Input and Output Cables / 安装输入输出线缆
NOTE / 说明
1. Cables are routed in from the bottom and out from the top. The ground terminal is identified by a
进出线方式:下进上出。接地端子通常以
标识。
2. The colors of the power cables for your reference. The local cable color standards prevail.
线缆颜色仅供参考,请以当地电源线缆标准为准。
Port Description / 接口说明
cable diameter / 线径
Bolts / 螺栓
2
UPS (+ N -)
240mm
M16
PE / 地线
2
150mm
M12
2
BAT (+ N -)
240mm
M16
Input cables / 输入接线
1.
Front view of the box / 电池开关盒前视图
Output cables / 输出接线
2.
Front view of the box / 电池开关盒前视图
4
Install the signal cables. 安装信号线缆。
3.
sign.
Recommended Torque / 推荐扭
矩 (N· m)
120
47
120
Front view of the cabinet / 机柜前视图
Cascading of BIB / BIB板级联
6.1
To UPS BCB signal port
接往UPS BCB 干接点接口
BIB1
NOTE / 说明
A maximum of four BIBs can be cascaded.
最多支持4个BIB级联。
6.2
DIP switch settings of BIB / BIB板拨码开关状态设置
Number of BIB / BIB
板个数
1
2
3
4
To UPS BCB signal port
接往UPS BCB干接点接口
BIB板 J1接口
UPS BCB干接点接口
J1 Signal Port on
UPS BCB Signal Port
the BIB board
5 OL
OL
6 STA
STA
7 DRV
DRV
8 GND
0V
NOTE / 说明
BIB board description / BIB板描述
Control signal port J1 / 控制信
J1
号接口J1
S1
DIP switch S1 / 拨码开关S1
BIB2
BIB3
BIB4
DIP switch settings for different numbers of BIB / 不同BIB板个数拨码开关设置状态
BIB 1
BIB 2
BIB 3
Toggle switch 1 ON
_
_
_
1脚ON
Toggle switch 2 OFF
_
_
_
2脚OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
_
_
1脚OFF
1脚OFF
Toggle switch 2 OFF
Toggle switch 2 ON
_
_
2脚OFF
2脚ON
Toggle switch 1 OFF
Toggle switch 1 OFF
Toggle switch 1 ON
_
1脚OFF
1脚OFF
1脚ON
Toggle switch 2 OFF
Toggle switch 2 OFF
Toggle switch 2 OFF
_
2脚OFF
2脚OFF
2脚OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
Toggle switch 1 OFF
1脚OFF
1脚OFF
1脚OFF
1脚OFF
Toggle switch 2 OFF
Toggle switch 2 OFF
Toggle switch 2 OFF
Toggle switch 2 ON
2脚OFF
2脚OFF
2脚OFF
2脚ON
5
7
Checking After Installation / 安装后检查
After the installation is completed, verify the items in the following tables before power-on.
安装完成后,在上电前,请根据下表内容进行检查。检查合格后方可进行上电操作。
Electrical connection checklist / 电气连接检查
7.1
No. /
编号
All cables are correctly connected based on the Schematic Diagram.
1
参考原理图,检查所有接线是否正确。
Ground cables are securely connected.
2
检查地线是否已连接牢靠。
Redundant parts of the ground cables and power cables are cut off instead of coiled.
3
电源线、地线的余长应被剪除,不能盘绕。
Power cables and ground cables are routed and bundled separately from other types of cables.
4
电源线、地线在布放时应与其他电缆分开绑扎。
All circuit breakers are OFF.
5
所有空开处于"OFF"状态。
Hardware installation checklist / 硬件安装检查
7.2
No. /
编号
The box is clean, without dust or sundries.
1
开关盒清洁干净,无灰尘、污物,里面无杂物。
The paint on the cabinet exterior is intact. If paint flakes off, repaint that area immediately to avoid corrosion.
2
外部漆饰应完好,如有掉漆,立即补漆,以防止腐蚀。
The box door and lock work properly.
3
开关盒门开闭灵活,门锁正常。
All labels are correct, clear, and complete.
4
各种安全警告标识正确、清晰、齐全。
The surrounding area of the box contains no waste tape, cable ties, paper, or packing materials.
5
周围不得有胶带、扎带线头、纸屑和包装袋等施工遗留物。
Cable installation checklist / 线缆安装检查
7.3
No. /
编号
All bolts are tightened, especially the bolts used for electrical connection. Flat washers and spring washers
1
are installed properly in the correct sequence.
所有螺栓都要拧紧(尤其要注意电气连接部分),平垫、弹垫要齐全,且不能装反。
Cables are bundled neatly, and cable ties are secured evenly and properly in the same direction.
2
电缆绑扎应整齐美观,线扣间距均匀,松紧适度,朝向一致。
Cables are routed for ease of future maintenance and expansion.
3
电缆布放应便于维护和将来扩容。
There is no unnecessary adhesive tape or cable tie on the cables.
4
线缆上无多余胶带、扎带等遗留。
Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing.
5
接线端子处的裸线及线鼻柄应用绝缘胶带缠紧,或套热缩套管,不得外露。
The power and signal cables are routed in accordance with the weak- and strong-current cable routing
6
specifications and the cable routing plan.
电源线走线和监控线走线满足强弱电走线要求,符合系统走线规划。
8
Powering On and Commissioning / 上电调测
1.
Switch on the MCCB in the battery switch box.
合上电池开关盒内塑壳断路器。
2.
Check that the voltage of each output branch is normal by using a multimeter.
BIB 4
用万用表检查输出支路电压是否正常。
3.
After the check, switch off all circuit breakers in sequence.
检查所有电压正常后,依次断开所有空开。
This guide is for reference only, if any change, the actual product prevails.
本指南仅供参考,内容如有改动,请以实物为准。
Check That / 检查项
Check That / 检查项
Check That / 检查项
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
Shenzhen 518129
People's Republic of China
www.huawei.com
华为技术有限公司
深圳市龙岗区坂田华为总部办公楼
邮编:518129
www.huawei.com
4008302118
6

Advertisement

loading