Commissioning After Taking Out Of Operation - ABB HT575643 Operation Manual

Table of Contents

Advertisement

Operation Manual / 4 Product description / A100-M axial
3 Commissioning / 3.3 Commissioning after taking out of operation
3.2.4
Checks when starting up the engine
Measure speed, oil pressure and charging pressure at various engine performances.
u
Measure the exhaust gas temperature before and after the turbine.
u
Measure the air temperature before and after the compressor.
u
Compare the measured values with the values of the acceptance report. Different operat-
u
ing conditions indicate a malfunction (see Chapter
Escape of oily fluids
Lubricants and pastes used during assembly can liquefy or vaporise and escape as oily fluids
during the initial hours of operation. Continual escape of an oily fluid indicates an oil leak.
If there is a leak, contact an ABB Turbocharging Service Station.
u
3.3

Commissioning after taking out of operation

If present
Remove cover plates (blind flanges) from the compressor casing, the gas inlet and the
u
gas outlet.
© Copyright 2017 ABB. All rights reserved.
Troubleshooting
HZTL4033_DE
→45).
Revision B
December 2017

Advertisement

Table of Contents
loading

This manual is also suitable for:

A175-m62

Table of Contents