ABB HT573783 Operation Manual page 10

Table of Contents

Advertisement

Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
1 Preliminary remarks / 1.4 Storage of new turbochargers and spare
parts
© Copyright 2018 . All rights reserved.
Long-term storage of replacement turbochargers or spare parts
Per order, turbochargers or cartridge groups will be prepared by ABB
Turbo Systems for prolonged storage. The package is equipped with a
hygrometer (see illustration).
The following measures are required every 6 months:
Check the hygrometer (02) in the sight-glass. There is an opening (01)
u
in the wooden crate which allows this check to be carried out. When
the display field has changed colour at the 70% level, the maximum
permissible humidity has been exceeded. In this case the turbochar-
ger or rotor must be inspected by an ABB Turbocharging Service Sta-
tion and repacked.
Inspect the package for damage. If the package is damaged, the tur-
u
bocharger or cartridge group must be inspected by an ABB Tur-
bocharging Service Station and repacked.
After every 3 years the following work steps must be performed by an
ABB Turbocharging Service Station:
¡
Inspect the components
¡
Exchange the desiccant agent
¡
Repackage the components.
NOTICE
Replacement components ready for operation
If the 70% display field of the hygrometer (02) has not changed colour
and the package is undamaged, the replacement turbocharger or re-
placement cartridge group can be placed into operation without any
prior testing by an ABB Turbocharging Service Station.
Unpacking replacement turbochargers or spare parts
The corrosion protection effect ends after the material is unpacked from
the VCI package.
To avoid the formation of condensation, the surroundings and the con-
tent of the package must have the same temperature during unpacking.
HZTL2498_EN
Revision C
April 2018

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tpl65-a33

Table of Contents