Download Print this page

Step 3 Elbow Assembly - ABB Thomas & Betts Elastimold 252LRJS-IEC Installation Instructions

Deadbreak elbow connectors with jacket seal

Advertisement

IS- - 1627
IS- - 252LRJS- - IEC
Revision: 0
Page 4 of 5
STEP 3
ELBOW ASSEMBLY
1.
Clean the cable insulation and inside the elbow housing
and lubricate with the lubricant supplied. DO NOT
SUBSTITUTE. Other lubricants may be harmful to this
product or its mating product(s). Keep insulation clean
of dirt and grime.
2.
Slide the elbow connector onto the cable with a
back and forth twisting motion. Wipe off all excess
lubricant.
3.
Align elbow with compression lug's threaded hole.
4.
Thread probe into lug by hand, taking care not to
cross--thread. Tighten with wrench until wrench
bends.
STEP 4
ASSEMBLE BAIL
Place hold--down bail in hold--down bracket.
STEP 5
CONCENTRIC NEUTRAL CONNECTION OR COPPER TAPE
1.
Pull the hood over the concentric neutral seal area on
the cable by pulling the tabs and/or rolling the seal
down.
2.
Using a separate copper wire (No. 14 AWG / 2.5mm)
or equivalent, insert one end through the grounding eye
on the elbow. Twist tightly taking care not to damage
the eye.
3.
Connect copper braid and wire to ground using
appropriate connector. Provide adequate slack in
wires for elbow operation.
Lubricate
Bracket
Compress Bail &
Bracket
Insert into Brackets
Grounding Eye
Copper Wire
To Ground
Twist
Wrench Hole
Wrench
Optional Bail Locator
No. 14
Probe
Copper Braid
to Ground

Advertisement

loading

This manual is also suitable for:

Thomas & betts elastimold 252lr-b2035Thomas & betts elastimold 252lr-b2025Thomas & betts elastimold 252lr-b2035-sThomas & betts elastimold 252lr-b2025-s