Installation Site Requirements; Ventilation Requirements - D-Link DGS-6604-SK Quick Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Installation Tools Requirements
Type
Tools
Common
Claw hammer,
Tools
pliers
Phillips-head
screwdriver,
straight
screwdriver,
spanner
Power supply
cables,
network
cables, optical
fibers and
distribution
cables
Ruler, long
tapeline,
marker pen
Bolts, diagonal
pliers, straps
Special
Anti-static tool
purpose
tools
Wire stripper,
crimping pliers
Meter
Multimeter
500V
Megohm-
meter
Table 3. Required Tools

Installation Site Requirements

The DGS-6600 series chassis switch must be
used indoors. To ensure the normal operation
and prolonged useful life of the equipment,
the installation site must meet the following
requirements.
Requirements for Rack Mounting
If you plan to mount the DGS-6604 in
a frame, please observe the following
guidelines:
Remarks
Unpack wooden
case and
transportation case.
Disassemble
chassis, power
supply, fan and
modules
Connect the
interfaces.
Measure the
installation position.
Mount the chassis.
Prevent static
electricity.
Create network
cables and
grounding cables.
Test power supply
and DC resistance.
Test the insulation
and grounding
resistance
Install the switch in an open cabinet if pos-
sible. If you install the switch inside a closed
cabinet please ensure that the cabi net has
a good ventilation and heat dissipation
system.
Ensure that the cabinet is durable enough
to bear the weight of the DGS-6604 and
its installation accessories.
Ensure that the dimensions of the cabinet
provide enough space for the installation
of the front, rear, left and right panels of
the DGS-6604 for the purpose of heat
dissipation.
The frame should be properly grounded.

Ventilation Requirements

Following figure shows the ventilation
requirements of the DGS-6604. You must
reserve sufficient space near the vents to ensure
proper ventilation. After the cables have been
connected, they should be arranged into bundles
or placed on the cabling rack to prevent the
obstruction of air intakes and vents.
Figure 3. Ventilation of the DGS-6600 series chassis
switch
Mounting the DGS-6600 series chassis switch
into the Cabinet
1. Lift the chassis (seek assistance if the chassis
is more then you can lift safely) while keeping it
level Slowly move it to the front of the frame.
2. Keeping the DGS-6604 level, lift it to a posi -
tion slightly higher than the tray of the slide rail
of the cabinet. Set the chassis onto the tray or
the slide rail, and push it into the cabinet. The
use of a tray or slide rail to assist in installing
the chassis to the rack is recommended.
3. Fasten the DGS-6604 to the cabinet with
screws. Fastening notches are on both the
left and right sides of the front panel on the
equipment frame. Use screws to fasten them
to the bracket of the cabinet/ Once fastened,
the equipment should be stable and immobile.
6
7
8
u 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-6604Dgs-6600-cmDgs-6600-pwr

Table of Contents