DEH40229 - Installation Instructions
PowerMark Plus™ Load Centers
100–225 Ampere Single- and Three-Phase 10–42 Circuit
Rainproof Type
WARNING: Hazard of electrical shock or burn. Turn off
power before working inside this equipment.
General
To comply with the Canadian Electrical Code and the Canadian
Standards Association, the load center must be installed in
accordance with the information included on the label on the
inside of the equipment. This must also be done in accordance
with the applicable local electrical codes and by a qualified
electrical contractor or licensed electrician. For troubleshooting
or service related questions,
https://electrification.us.abb.com/products/load-centers
Installation
1. Remove the Door
Back out the door hinges. Remove the door and slip it back into
the carton to protect the finish. Save the screws for reuse.
2. Remove the Shield
a. Loosen the fastening screw (the screw will be retained in the
shield).
b. Insert a screwdriver under the loop, then lift the shield up
and out.
c. Slip the shield back into the carton to protect the finish.
3. Remove the Service Entrance Barrier (Main Breaker only)
Back out and save the mounting screw securing the service
entrance barrier over the main breaker connections, then lift the
barrier up and out.
Barrier
Mounting
Screw
4. Remove the Interior (Optional)
Back out the mounting screws and save them for reuse.
Mounting
Screws
5. For Top Feed, Screw the Hub (Not Included) onto the
Installed Conduit
Raintight hubs can be installed in any of the four positions
indicated below.
6. Fasten the Hub or Closing Cap to the Box
Attach the hub with the four screws supplied with the kit. No
gasket is required. If a hub is not used, attach the supplied closing
cap with the four screws in the kit.
7. Mount the Box
Screw or nail through the rear mounting holes.

Advertisement

loading

Summary of Contents for ABB GE PowerMark Plus DEH40229

  • Page 1 For troubleshooting Mounting or service related questions, Screws https://electrification.us.abb.com/products/load-centers Installation 1. Remove the Door Back out the door hinges. Remove the door and slip it back into the carton to protect the finish. Save the screws for reuse.
  • Page 2 — should be referred to ABB Company. ABB Inc. 305 Gregson Drive Cary, NC 27511 GE is a registered trademark used under license from General Electric company...
  • Page 3 à l’intérieur de la porte. Cela doit également être fait en accord avec les codes électriques locaux et par un contracteur qualifié en électricité et/ou un électricien certifié. Pour les questions relatives au dépannage ou aux services, https://electrification.us.abb.com/products/load-centers Installation Vis de 1. Enlever la porte montage Retirer les vis des charnières de la porte.