Haier GE APPLIANCES NF96US Installation Instructions Manual page 35

Warm air gas furnace upflow/ horizontal left/right air discharge direct vent & non-direct vent
Hide thumbs Also See for GE APPLIANCES NF96US:
Table of Contents

Advertisement

* Piping from furnace must slope down a minimum of 1/4" per ft. toward trap.
Figure 52. Condensate Trap Locations
Figure 53. Unit with Cooling Coil Using Separate
Figure 54. Evaporator Coil Using a Common Drain
Drain
Piping from furnace and evaporator coil must slope down a minimum 1/4" per ft. toward trap.
Figure 55. Evaporator Coil Using a Common Drain
507768-05G / 31-5000655
Issue 2223
Page 35 of 56

Advertisement

Table of Contents
loading

Table of Contents