Table of Contents

Advertisement

2 Installation

Instructions 56-8101-02 Edition AE
CAUTION! Before connecting Valves IV-908 or PV-908 ensure the power
is switched OFF at the system pump or for the complete system.
Unpacking
Unpack the instrument and check the items against the packing list.
Inspect the items for obvious damage which may have occured during
transportation.
1 Connect the valve with two UniNet cables
as a part of the UniNet 2 chain.
2 Set the ID-switch at the bottom to the
required valve number 0–9. The number
should correspond to that used in UNICORN.
Note: All valves must have different numbers.
3 Mount the valve vertically, in the way it
is shown in the user documentation of
your ÄKTAdesign chromatography system.
4 Apply an identification number from the
labels supplied. The number should be the same as the rotary switch at
the bottom of the valve. Place the number so that it is easily readable
from the front.
5 Connect the tubing. The valve has one main port marked i/o and
8 peripheral ports equally spaced marked 1–8.
Position 1
1
8
7
2
i/o
6
3
4
5
The low pressure valve IV-908 has female
5/16"–24 UNF 2B connections.
The high-pressure valve PV-908 has female
UNF 10-32 2B connections.
Position 2
etc.
1
8
7
2
i/o
6
3
4
5
Installation 2
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pv-90818-1108-4218-1108-41

Table of Contents