Panasonic IO-Link SC-LG-CEF User Manual
Panasonic IO-Link SC-LG-CEF User Manual

Panasonic IO-Link SC-LG-CEF User Manual

Configuration tool

Advertisement

Quick Links

WUME-SCLGCT-3
2023.1
panasonic.net/id/pidsx/global
IO-Link Configuration Tool
SC-LG-CEF
Configuration Tool
User's Manual

Advertisement

Table of Contents
loading

Summary of Contents for Panasonic IO-Link SC-LG-CEF

  • Page 1 IO-Link Configuration Tool SC-LG-CEF Configuration Tool User’s Manual WUME-SCLGCT-3 2023.1 panasonic.net/id/pidsx/global...
  • Page 2 (MEMO) WUME-SCLGCT-3...
  • Page 3 Notes 1) No part of this manual may be reproduced or reprinted in any form or by any means without prior written permission from Panasonic. 2) The contents of this manual are subject to change without notice for future improvement.
  • Page 4: Manual Configuration

    Manual Configuration This chapter explains the terminology, the functions of this 1 Before Using This Product software tool, the software license agreement for the soft- ware tool. This chapter explains the system environment, system 2 Preparation overview, and connections. 3 Name and Function of This chapter explains the name and function of each con- Each Window figuration window.
  • Page 5: Table Of Contents

    Contents Manual Configuration ··········································································4 1 Before Using This Product ·····························································1-1 1.1 Handling Precautions ·································································· 1-2 1.2 Terminology ·············································································· 1-2 1.3 Overview ·················································································· 1-3 1.4 Software License Agreement ························································ 1-4 2 Preparation ·················································································2-1 2.1 System Environment ··································································· 2-2 2.2 System Overview ······································································· 2-3 2.2.1 System Connection Diagram ·····················································2-3 2.3 Setup on the Programmable Controller (GX Works3) Side ··················...
  • Page 6 (MEMO) WUME-SCLGCT-3...
  • Page 7: Before Using This Product

    1 Before Using This Product 1.1 Handling Precautions ·································································· 1-2 1.2 Terminology ·············································································· 1-2 1.3 Overview ·················································································· 1-3 1.4 Software License Agreement ························································ 1-4...
  • Page 8: Handling Precautions

    1.1 Handling Precautions 1.1 Handling Precautions ■The following symbols are used to indicate safety information that must be observed. Indicates an action that is prohibited. Indicates an action that must be taken. Indicates a matter that requires caution. Information Indicates supplemental information. Reference Indicates reference to details about the subject in question.
  • Page 9: Overview

    1.3 Overview Term Description Cycle data. Process data is automatically transmitted during normal op- Process data (PD) eration. One of the international certifications handling PLC standards that spec- IEC 61131-9 ifies an I/O connection technology standardized for communication with sensors or actuators IODD Describes the device's own information and settings IO-Link re-...
  • Page 10: Software License Agreement

    1.4 Software License Agreement 1.4 Software License Agreement Panasonic Industrial Devices SUNX Co., Ltd. (“PIDSX”) grants to you a license to use this Soft- ware on condition that you accept this Agreement. You must read this Software License Agree- ment (this “Agreement”) carefully before using this Software. Only in case that you accept this Agreement, you may start your use of this Software.
  • Page 11 1.4 Software License Agreement Article 5 Export Control You shall comply with all laws and regulations regarding export control under any competent jurisdiction, including but not limited to the Japanese Foreign Exchange & Foreign Trade Control Law, the export control regulations based on resolutions of the United Nations Security Council, etc.
  • Page 12 (MEMO) WUME-SCLGCT-3...
  • Page 13: Preparation

    2 Preparation 2.1 System Environment ··································································· 2-2 2.2 System Overview ······································································· 2-3 2.2.1 System Connection Diagram ·····················································2-3 2.3 Setup on the Programmable Controller (GX Works3) Side ·················· 2-4...
  • Page 14: System Environment

    2.1 System Environment 2.1 System Environment SC-LG-CEF Configuration Tool operates in the following system environment. ● Compatible operating systems: ® ® Microsoft Windows 10 Pro 32bit, 64bit ● Processor: Atom 1.33GHz or faster processor ● Memory: 2GB minimum ● Display: 1,024 × 768 or higher resolution with at least 256 colors ●...
  • Page 15: System Overview

    IO-Link device must be imported into SC-LG-CEF Configuration Tool. Caution ● Download the IODD files from the website of the IO-Link device manufacturer or the IODDfinder website (https://ioddfinder.io-link.com/). ● The IODD files of Panasonic IO-Link devices can be downloaded from our website (https://panasonic.net/id/pidsx/global). WUME-SCLGCT-3...
  • Page 16: Setup On The Programmable Controller (Gx Works3) Side

    2.3 Setup on the Programmable Controller (GX Works3) Side 2.3 Setup on the Programmable Controller (GX Works3) Side This section explains how to set up parameters for IO-Link master SC-LG2-CEF-P. The parameter setting method differs according to the master station unit. The parameter setting method is explained below, using Mitsubishi Electric Corporation's RJ71EN71 as an example.
  • Page 17 2.3 Setup on the Programmable Controller (GX Works3) Side ● Setting up RJ71EN71(CCIEF) unit parameters Set up parameters in the engineering software (GX Works3) at the master station. In the Navigation window, select Module Information and then RJ71EN71(CCIEF). Reference For details on how to set up the master station, refer to the instruction manual of the master station unit that you use.
  • Page 18 Double-click <Detailed Setting> in Network Configuration Settings. The CC IE Field Configuration dialog box will be displayed. In the Module List, select SC-LG2-CEF-P under CC IE Field Module (Panasonic Indus- trial Device SUNX) and drag and drop it into the station list or network configuration diagram.
  • Page 19 2.3 Setup on the Programmable Controller (GX Works3) Side Set up a CC IE Field configuration as shown below. After setting up the configuration, click the Close with Reflecting the Setting menu to close the CC IE Field Configuration dialog box. WUME-SCLGCT-3...
  • Page 20 2.3 Setup on the Programmable Controller (GX Works3) Side Double-click <Detailed Setting> in Refresh Settings. A refresh parameter setting window will be displayed. Specify settings as below. WUME-SCLGCT-3...
  • Page 21: Name And Function Of Each Window

    3 Name and Function of Each Window 3.1 Operating Procedure ·································································· 3-2 3.2 Login Window ··········································································· 3-3 3.3 Start Window············································································· 3-4 3.4 Master Port Configuration Window ················································· 3-5 3.4.1 Master Port Configuration ·························································3-5 3.4.2 Select Device Window ·····························································3-8 3.5 Master Information Window ························································ 3-10 3.6 Device Monitoring Window ·························································...
  • Page 22: Operating Procedure

    3.1 Operating Procedure 3.1 Operating Procedure The procedure for operating SC-LG-CEF Configuration Tool is shown below. Reference section “3.2 Login Window” Login (Note 1) Log in to SC-LG-CEF Configuration Tool. “3.3 Start Window” Start Select appropriate start options for SC-LG-CEF Configuration Tool.
  • Page 23: Login Window

    3.2 Login Window 3.2 Login Window In the Login window, log in to the tool by entering the password corresponding to the user au- thority of SC-LG-CEF Configuration Tool. When SC-LG-CEF Configuration Tool starts, the Login window is displayed only if the Auto Login check box in the Option window is not selected.
  • Page 24: Start Window

    3.3 Start Window 3.3 Start Window This window is used to select appropriate start options and start SC-LG-CEF Configuration Tool. Name Description Select this option to set up a new IO-Link master or IO-Link device offline. Open Select this option to open the file of a project that has been set up before. Select this option to load data from an IO-Link master that is connected to the PC via a PLC.
  • Page 25: Master Port Configuration Window

    3.4 Master Port Configuration Window 3.4 Master Port Configuration Window 3.4.1 Master Port Configuration This window is used to display and set up each port of the IO-Link master selected in the tree on the left side of the window. If you select an IO-Link master in the tree, a master port subwindow will be displayed in the Port Setting tab.
  • Page 26 3.4 Master Port Configuration Window Name Description Clicking this button changes the settings of all the ports to IO-Link mode and detects the IO-Link devices connected to the selected IO-Link master. Detect Devices If the selected IO-Link master is unconnected the Detect Devices button will be grayed out.
  • Page 27 3.4 Master Port Configuration Window Name Description If you select IO-Link in the Mode column, you can select the validation level and data storage mode as below. Validation & Backup ● No Check: No IO-Link device validation or data storage is performed. ●...
  • Page 28: Select Device Window

    3.4 Master Port Configuration Window 3.4.2 Select Device Window This window allows you to select the IO-Link device to be connected to the IO-Link master. Clicking the button in the master port configuration window displays the Select Device window. Name Description IO-Link devices in the device list can be narrowed down to the IO-Link de- vices of the vendor that you select.
  • Page 29 3.4 Master Port Configuration Window Name Description The device list display method can be changed. ● Details: Displays IO-Link devices in detail Display method switching function ● List: Displays only IO-Link device names and vendor names This area displays IO-Link devices that match the search criteria specified Device list in Vendor, IO-Link Revision, Search, or Device Family.
  • Page 30: Master Information Window

    3.5 Master Information Window 3.5 Master Information Window This window displays device information for the IO-Link master selected in the tree on the left side of the window. If you select an IO-Link master in the tree, a master information subwindow will be displayed in the Information tab.
  • Page 31: Device Monitoring Window

    3.6 Device Monitoring Window 3.6 Device Monitoring Window This window is used to monitor process data for the IO-Link device selected in the tree on the left side of the window. If you select an IO-Link device in the tree, a device monitoring subwindow will be displayed in the Monitor tab.
  • Page 32: Device Setup Window

    3.7 Device Setup Window 3.7 Device Setup Window This window is used to set up parameters for the IO-Link device selected in the tree on the left side of the window. If you select an IO-Link device in the tree, a device setup subwindow will be displayed in the Set tab.
  • Page 33: Device Diagnosis Window

    Operating Time The amount of IO-Link device operating time is displayed. Stored Count The number of write operations to the IO-Link device is displayed. Information The Diagnosis tab is displayed only when a Panasonic IO-Link device is selected. WUME-SCLGCT-3 3-13...
  • Page 34: Device Information Window

    3.9 Device Information Window 3.9 Device Information Window This window displays device information for the IO-Link device selected in the tree on the left side of the window. If you select an IO-Link device in the tree, a device information subwindow will be displayed in the Information tab.
  • Page 35: Option Window

    3.10 Option Window 3.10 Option Window This window allows you to set options for SC-LG-CEF Configuration Tool. Selecting Option from the File menu displays the Option window as a pop-up window. Name Description You can set up auto login and specify a user authority and password that are required for auto login.
  • Page 36: Version Information Window

    3.11 Version Information Window 3.11 Version Information Window This window displays version information for SC-LG-CEF Configuration Tool. Selecting Version from the Help menu displays a pop-up window that shows the version infor- mation. 3-16 WUME-SCLGCT-3...
  • Page 37: Other Functions

    4 Other Functions 4.1 Master Addition Function ····························································· 4-2 4.2 Master Removal Function ···························································· 4-3 4.3 Master Assignment Function ························································ 4-3 4.4 Device Settings Copy / Paste Function ··········································· 4-4 4.5 Project Creation Function ···························································· 4-4 4.6 Project Saving Function ······························································· 4-5 4.7 IODD Management Function ························································...
  • Page 38: Master Addition Function

    4.1 Master Addition Function 4.1 Master Addition Function This function adds a new IO-Link master to the tree. Clicking the Add button under the tree displays the Adding a Master window. Name Description A list of IO-Link masters is displayed. By selecting an IO-Link master in the Create a new Master Create a new Master tab and then clicking the Add button, you can add the IO-Link master in an offline state to the tree.
  • Page 39: Master Removal Function

    4.2 Master Removal Function 4.2 Master Removal Function This function removes the selected IO-Link master from the tree. Clicking the Delete button under the tree displays a confirmation dialog box and clicking the OK button removes the selected IO-Link master from the tree. Information If an IO-Link device is selected in the tree, the Delete button will be grayed out.
  • Page 40: Device Settings Copy / Paste Function

    4.4 Device Settings Copy / Paste Function 4.4 Device Settings Copy / Paste Function This function enables you to copy and paste the settings of the IO-Link device that you select. By selecting and right-clicking an IO-Link device in the tree, you can copy and paste the settings of the IO-Link device.
  • Page 41: Project Saving Function

    ● IODD files that have been imported can be used until they are deleted. ● Download the IODD files from the website of the IO-Link device manufacturer or the IODDfinder website (https://ioddfinder.io-link.com/). ● The IODD files of Panasonic IO-Link devices can be downloaded from our website (https://panasonic.net/id/pidsx/global). WUME-SCLGCT-3...
  • Page 42: Network Number Setting Function

    4.8 Network Number Setting Function 4.8 Network Number Setting Function This function sets a network number for each IO-Link master. The Network number window is displayed when you add an IO-Link master without a network number or click the Network No. Setting button in the Information tab of the IO-Link master in- formation window.
  • Page 43: Language Switching Function

    4.9 Language Switching Function 4.9 Language Switching Function This function allows you to switch the language for SC-LG-CEF Configuration Tool. Selecting Language from the File menu enables you to switch the language between Japanese and English. Information When you have switched the language, restart SC-LG-CEF Configuration Tool. 4.10 Exit Function This function closes SC-LG-CEF Configuration Tool.
  • Page 44 (MEMO) WUME-SCLGCT-3...
  • Page 45: Messages

    5 Messages 5.1 Messages ················································································· 5-2...
  • Page 46 5.1 Messages Various confirmation dialog boxes are displayed when the user is asked for confirmation dur- ing operation or the device enters in an inoperable state. If any message is displayed, carefully read the following information and check an appropriate action method. 5.1 Messages Message Action method...
  • Page 47 Revision history Revision date Revision item First edition February 2019 ― • Revision due to software version upgrade (Ver. 1.3) 2nd edition December 2021 • Revision due to addition of compatible CC-Link IE Field master unit • Revised “ 1.4 Software License Agreement “ •...
  • Page 48 Panasonic Industry Co., Ltd. Panasonic Industrial Devices SUNX Co., Ltd. https://panasonic.net/id/pidsx/global Please visit our website for inquiries and about our sales network. Panasonic Industrial Devices SUNX Co., Ltd. 2023 January, 2023 WUME-SCLGCT-3...

Table of Contents