System Setup; Overview; Purpose Of Chapter 3 - GE LOGIQ C Series Basic Service Manual

Hide thumbs Also See for LOGIQ C Series:
Table of Contents

Advertisement

GE
D
5273008-100, R
IRECTION
Chapter 3

System Setup

Section 3-1

Overview

3-1-1

Purpose of Chapter 3

This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit and
external peripherals for electrical safety are included in this procedure. Also included LOGIQ C Series
in this section are guidelines for transporting the unit to a new site.
Table 3-1
Section
3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8
3-9
3-10
3-11
9
EVISION
Contents in Chapter 3
"Overview"
"Setup Reminders"
"Receiving and Unpacking the Equipment"
"Preparing for Installation"
"Completing the Installation"
"System Configuration"
"Software/Option Configuration"
"Connectivity Installation Worksheet"
"Loading Base Image Software"
"Software Version check out"
"Paperwork"
Chapter 3 System Setup
LOGIQ C B
Description
S
S
M
ASIC
ERIES
ERVICE
ANUAL
Page Number
3-1
3-2
3-3
3-4
3-5
3-6
3-7
3-8
3-9
3-10
3-11
3 - 1

Advertisement

Table of Contents
loading

Table of Contents