Download Print this page

Haier HW-WA101DBT Operation & Installation Manual page 5

Split controller

Advertisement

Controller Installation
The black terminal of the controller communication line is connected with the black
harness terminal at the lower outgoing line port of the unit� The other end of the controller
communication line is pressed on the wiring base of the controller, and the corresponding
relationship is red~+12V, black~GND, green~A2 and white~B2�
Connection terminal between controller communication line and IDU:
Controller
The Split IDU
All of the power supply and communication 485 cables between each module and terminal
module to the controller are double core shielded twisted-pair cable. Specific wiring as the
table below:
The communication line is connected with the controller
The length of signal line
Wiring dimension
2
≤100m
0�75mm
×4
Fix the screw through the bracket on the 86 cassettes and connect the connection� The red
connects to the +12V and black to GND, the green connects to A2, and the white connects
to B2. Please pay attention to the line order. Then the controller is fixed down.
Notes:
1� B1 and A1 are unavailable�
2� B2 and A2 for 485 interface, access to split unit's 485 B and A, paying attention to line
order�
3� ARALM1 and ALARM2 factory default is connected, if not be connected, then the main
interface of the controller will display alarm information, and all indoor units will be turned off.
4

Advertisement

loading