GE 750 UL S2 User Manual page 66

Table of Contents

Advertisement

3
Insert the Inverter by pressing the "Inverter ON" ( I ) key on first unit.
Soft-start of Inverter, indicated with blinking LED 5 (Inverter available).
At the end of Soft-start the LED 5 (Inverter available) remains lit.
In case of sufficient output power, the output will transfer to Inverter.
Synoptic Diagram of first unit
4. Insert the Inverter by pressing the "Inverter ON" ( I ) key on all other units.
Do not start the next Inverter until the sequence of the previous ends.
Soft-start of Inverter, indicated with blinking LED 5 (Inverter available).
At the end of Soft-start the LED 5 (Inverter available) remains lit.
As soon as the output power of the Inverters is sufficient to supply the Load, the output of the units with
running Inverter will transfer to Inverter.
LED Alarm turn Off and the LED Operation must be lit.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY INVERTER".
Synoptic Diagram of first unit
Modifications reserved
OPM_SGS_USM_M75_M75_2US_V010.doc
END OF PROCEDURE
Synoptic Diagram of other units
Synoptic Diagram of other units
User Manual SG Series 750 UL S2 & SG Series 750 T12 UL S2
Page 66/71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg series750 t12 ul s2

Table of Contents