Figure 8. Lifting the rack cabinet
Step 2.
Install one M10 eye bolt to each hole, and make sure they stay solidly connected to the cabinet.
Step 3.
Connect the four eye bolts to the hook of a crane lifter, and make sure the cord length allows an
angle more than 75˚.
Step 4.
Lift the cabinet and place it to the designated site.
After moving the cabinet to the designated site, complete the following steps:
1. Make sure the leveling feet are down and make firm contact to the ground. If not, insert a 13-mm open-
ended wrench into the screw above one of the feet, and turn it clockwise until the foot makes firm
contact with the floor.
.
Chapter 4
Move the rack cabinet
11