Installation Of Variants With Heat Pumps; General Operating Conditions; Transport; Air Intake Vent - Miele PDR 511 SL HP Installations Plan

Commercial heat-pump dryer
Hide thumbs Also See for PDR 511 SL HP:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12

Installation of variants with heat pumps

General operating
conditions

Transport

Air intake vent

This heat-pump dryer is intended only for use in a commercial envir-
onment and must only be operated indoors.
Ambient temperature for optimum heat-pump operation:
+10 °C to +40 °C
The ambient temperature for the heat-pump dryer must be at least
10 °C.
At lower ambient temperatures, there is a risk of ice forming on the
lower heat exchanger. This can also result in unexpected condens-
ate formation.
Depending on the nature of the installation site, sound emissions and
vibrations may occur.
Tip: Have the installation site inspected and seek the advice of a pro-
fessional in instances where increased noise may cause a nuisance.
The tumble dryer and the heat pump must not be transported
without transport pallets.
Suitable transport aids must always be used during transportation.
Tilting the heat pump by more than 30° should be avoided if at all
possible.
After the heat pump has been transported, it should be left to stand
for approximately one hour before commissioning. If the heat pump is
subjected to especially strong vibrations or is tilted by more than 30°,
it should be left to stand for up to 24 hours.
At the next installation site, the tumble dryer and the heat pump must
be lifted off the transport pallet using suitable lifting gear.
If the heat-pump unit is tilted up to a maximum of 30° during trans-
portation, it must be left to stand for at least one hour after it has
been installed before the heat-pump dryer can be operated.
If the heat-pump unit was tilted by an angle exceeding 30° or if it was
subjected to strong vibrations, the machine must be left to stand for
24 hours before commissioning.
After transportation and installation, downtime of at least one hour
is required before connecting the tumble dryer to the electricity
supply.
Insufficient downtime before commissioning can damage the heat
pump.
Air intake for the condenser is via an air intake vent at the front of
the dryer. Air is taken from the room in which the dryer is installed.
A fluff filter is located in the air intake vent in the dryer. This must be
regularly cleaned by hand.
en - Installation notes