Testing Operation

1. Turn on power at the breaker.
2. Check power at junction box using a volt meter.
For 240 V installation, the reading between the red and black wires (line to line)
should be 220 to 240 volts.
For 208 V installation, the reading between the red and black wires (line to line)
should be 190 to 208 volts.
3. Test the oven mode.
Select the BAKE mode. See the Use and Care Manual for detailed operation
instructions.
4. Verify that the oven light comes on and the oven begins to preheat.
5. Test the door lock.
Set the SELF CLEAN mode. Confirm that the door locks when the lock icon
appears in the display.
6. If installing a double oven, test the second oven as well.
7. If any of the tests do not result as explained above, contact Siemens service for
assistance. Otherwise, the installation is complete at this time.
English 9