Download Print this page

Zanussi ULTRA COMBI 35 Installation And Servicing page 9

Hide thumbs Also See for ULTRA COMBI 35:

Advertisement

OPTIONAL EXTRA KITS
Horizontal Flue Terminal 1000mm long
Horizontal Flue Terminal 600mm long
Horizontal Flue Terminal 600mm long (Weather Protection)
Horizontal Telescopic Flue
• Flue Finishing Kit
Flue Extension Ducts (1000mm long)
Flue Extension Ducts (2000mm long)
Flue Extension Ducts (500mm long)
30-up to 8m
35-up to 6m
90
Elbow Kit (maximum per installation).
o
30-upto 6 elbows
35-upto 4 elbows
45
Elbow Kit (maximum per installation).
o
30-upto 6 elbows
35-upto 4 elbows
Concentric Flue Screw Retaining Kit
Roof Flue Kit (to a maximum of 7.5m)
Powered Vertical Flue Kit (5m primary and 17m secondary
is a typical maximum length. For alternative details refer to
Powered Vertical Instructions)
Weather Collar
High Level Flue Outlet Kit
Flue Deflector Kit
Balcony Flue Kit
Soffit Flue Kit
Raised Horizontal Flue Outlet Kit
Adjustable Flue Support Bracket
Mechanical Timer (24 hr) Kit
Electronic Timer (7 day) kit
RF Mechanical Programmable Room Thermostat (24 hr)
kit
RF Electronic Programmable Room Thermostat (7 day)
kit
Weather Compensation Kit
Stand-Off Kit
Stand-Off Kit (inc. pipes)
DHW Expansion Vessel Kit
Pre-Piping Frame Kit
Condensate Pump Kit
Security Bracket Kit
PRV Wall Outlet Kit
Pressure Gauge Extension Kit
RF Mechanical Timer and Room Thermostat Kit
OpenTherm Harness Kit
Outside Sensor Kit
Installation and Servicing
GENERAL
SAFETY
Current Gas Safety (installation and use) regulations or rules
in force:
The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force.
In GB, the installation must be carried out by a Gas Safe
Registered Engineer. It must be carried out in accordance with
the relevant requirements of the:
Gas Safety (Installation and Use) Regulations
The appropriate Building Regulations either The Building
Regulations, The Building Regulations (Scotland), Building
Regulations (Northern Ireland).
The Water Fittings Regulations or Water byelaws in Scotland.
The Current I.E.E. Wiring Regulations.
Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.
In IE, the installation must be carried out by a Registered Gas
Installer (RGII) and installed in accordance with the current edition
of I.S.813 "Domestic Gas Installations", the current Building
Regulations and reference should be made to the current ETCI
rules for electrical installation.
Detailed recommendations are contained in the following British
Standard Codes of Practice:
BS. 5440:1
Flues (for gas appliances of rated input not
exceeding 70 kW).
BS. 5440:2
Ventilation (for gas appliances of rated input not
exceeding 70 kW).
BSEN. 12828:2003 Heating Systems in buildings: Design for
BSEN 12831:2003
BSEN 14336:2004
BS. 5546
Installation of gas hot water supplies for domestic
purposes (2nd Family Gases)
BS. 6798
Installation of gas fired hot water boilers of rated
input not exceeding 70 kW.
BS. 6891
Health & Safety Document No. 635.
The Electricity at Work Regulations, 1989.
The manufacturer's notes must NOT be taken, in any way, as
overriding statutory obligations.
IMPORTANT. These appliances are CE certificated for safety
and performance. It is, therefore, important that no external
control devices, e.g. flue dampers, economisers etc., are
directly connected to these appliances unless covered by
these Installation and Servicing Instructions or as otherwise
recommended by the manufacturer in writing. If in doubt please
enquire.
Any direct connection of a control device not approved by the
manufacturer could invalidate the certification and the normal
appliance warranty. It could also infringe the Gas Safety
Regulations and the above regulations.
SAFE HANDLING OF SUBSTANCES
No asbestos, mercury or CFCs are included in any part of the
boiler or its manufacture.
water based heating systems.
Heating Systems in buildings: Method for
calculation of the design heat load.
Heating Systems in buildings: Installation
and commissioning of water based heating
systems.
Low pressure installation pipes.
9

Advertisement

loading

This manual is also suitable for:

Ultra combi 30