Mitsubishi Electric MVZ-A12AA7 Installation Manual page 15

Hide thumbs Also See for MVZ-A12AA7:
Table of Contents

Advertisement

Available languages

Available languages

7
8
9
8
9
3
4
5
The parts are required to meet the latest RoHS directive.
DETAIL A
3
4
METAL TAB
BEND AROUND
THE WIRE
HARNESS
7
8
9
5
6
3
4
5
Step. 4b Cut the plastic ties that are securing the extra wiring
for the Thermistor (CN44). Route the thermistor wires into the
Electrical section of the air handler on the left side of the coil.
-Use the metal tab in Detail A to secure the wires
-The notch in the drain pan allows the wires to pass the drain pan,
go through the sheetmetal shelf which now supports the Coil
8
9
Assembly and enter the Electrical section of the Air Handler.
Reconnect the Thermistor (CN44) to the control board.
10
11
12
10
11
6
7
8
DETAIL A
5
10
11
12
DETAIL A
DETAIL A
7
8
DETAIL A
6
7
8
10
11
13
14
12
13
DRIP LOOP
INSIDE DRAIN PAN
Step. 4c In order to prevent water from running down the
Thermistor wires into the electrical area, a Drip Loop MUST be
installed to direct water into the drain pan.
9
10
11
6
7
MITSUBISHI ELECTRIC CORPORATION
3D
DATE
APPROVED
DIM.mm
SCALE
DRAWN
0.200
CHECKED
NTS
DESIGNED
13
14
Step. 5 Reinstall the panels over the drains and refrigerant lines.
Next, install the panels which cover the Coil (1
9
Blower (3
) and Filter (4
rd
Assembly will be installed upright as the original vertical orientation
from the factory, while the other panels' text will read upside down.
MITSUBISHI ELECTRIC CORPORATION
9
10
11
DATE
DIM.mm
DRAWN
SCALE
0.200
CHECKED
NTS
DESIGNED
12
13
15
16
A
14
B
C
D
E
12
13
14
F
8
9
G
H
3rd
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
I
CASTING
FINE COARSE
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
MACHINING
MEDIUMCOARSE
CONFIDENTIAL
J
1st
12
15
16
2nd
10
11
). NOTE: The panel which covers the Coil
th
MITSUBISHI ELECTRIC CORPORATION
3D
DATE
APPROVED
DIM.mm
SCALE
DRAWN
1:5
CHECKED
NTS
DESIGNED
3D
12
13
14
APPROVED
14
15
16
A
B
C
TO ELECTRICAL
SECTION
15
16
A
D
4th
10
11
B
E
C
D
F
E
PRIMARY DRAIN
3/4" FPT
F
G
G
MITSUBISHI ELEC
DATE
DIM.mm
H
SCALE
DRAWN
H
1:5
CHECKED
NTS
DESIGNED
), Electrical (2
),
st
nd
12
13
ITEM
MODEL NAME
COMMERCIAL TOLERANCE
WORK
GRADE
ITEM
MODEL NAME
I
CASTING
FINE COARSE
COMMERCIAL TOLERANCE
PRESS WORKING
A
B
C
D
E
GAS CUTTING A
B
WORK
GRADE
SHEARING
A
B
MACHINING
MEDIUM COARSE
I
CASTING
FINE COARSE
CONFIDENTIAL
PRESS WORKING
A
B
C
D
E
GAS CUTTING
A
B
SHEARING
A
B
J
12
MACHINING
MEDIUMCOARSE
15
16
CONFIDENTIAL
J
12
15
16
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mvz-a18aa7Mvz-a24aa7Mvz-a30aa7Mvz-a36aa7

Table of Contents