Completing The Initial Commissioning Process - Miele PDR 918 HP Operating And Installation Instructions

Commercial heat pump dryers
Hide thumbs Also See for PDR 918 HP:
Table of Contents

Advertisement

Skipping payment
system set-up
Payment system
No payment
Timed
system
operation
Programme
Timed op. +
control
impul.counter
No payment system
Touch the
Touch
OK
to confirm.
The display will change to the next setting.

Completing the initial commissioning process

The commissioning process is complete when a programme lasting
longer than 10 minutes has been carried out in full.
If the power is interrupted prior to the start of the first drying
programme (e.g. if the machine is switched off with the  button),
the initial commissioning process can be completed again. Once a
drying programme has been running for over 10 minutes, the initial
commissioning process cannot be carried out again.
In the main menu, touch the  Programmes sensor.
Programmes
Cottons
Cottons
Cottons PRO
Minimum iron
Swipe to the left with your finger until the
air
 programme is displayed.
Programmes
Timed drying
Woollens
cool air
Timed drying
Delicates
warm air
Timed drying cool air
Touch the
Overview
Weight
8,0
kg
Timed drying
cool air
Drying temp. 
0:10
Without heat
Using for the first time
11:02
COM module
OK
 sensor.
11:02
Woollens
Delicates
11:02
Timed drying
warm air hyg.
Basket - Low
temperature
 programme.
11:02
Duration
0:10
h
Timed drying cool
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pdr 914 hpPdr 922 hp

Table of Contents