Download Print this page

Adjustment Instruction - LG 26LV2500-DG Service Manual

Advertisement

1. Application Range
This specification sheet is applied to all of the LCD TV with
LT01M/P/R chassis.
2. Designation
1) The adjustment is according to the order which is
designated and which must be followed, according to the
plan which can be changed only on agreeing.
2) Power Adjustment: Free Voltage
3) Magnetic Field Condition: Nil.
4) Input signal Unit: Product Specification Standard
5) Reserve after operation: Above 5 Minutes (Heat Run)
Temperature : at 25±5ºC
Relative humidity : 65±10%
Input voltage : 220V, 60Hz
The receiver must be operated for about 5 minutes prior
to the adjustment when module is in the circumstance of
over 15°C
In case of keeping module is in the circumstance of 0°C,
it should be placed in the circumstance of above 15°C
for 2 hours
In case of keeping module is in the circumstance of
below -20°C, it should be placed in the circumstance of
above 15°C for 3 hours,.
Caution) When still image is displayed for a period of 20
minutes or longer, there can some afterimage in
the black level area.
6) Adjustment equipments : Color Analyzer (CA-210 or CA-
110), DDC Adjustment Jig equipment, SVC remote
controller.
7) Push The "IN STOP KEY" - For memory initialization.
Case1 : Software version up
1. After downloading S/W by USB, TV set will reboot
automatically
2. Push "In-stop" key
3. Push "Power on" key
4. Function inspection
5. After function inspection, Push "I n-stop" key.
Case2 : Function check at the assembly line
1. When TV set is entering on the assembly line, Push
"In-stop" key at first.
2. Push "Power on" key for turning it on.
-> If you push "Power on" key, TV set will recover
channel information by itself.
3. After function inspection, Push "In-stop" key.
Copyright
LG Electronics. Inc. All right reserved.
Only for training and service purposes

ADJUSTMENT INSTRUCTION

- 9 -
3. Main PCB check process
* APC - After Manual-Insert, executing APC
* Boot file Download
(1) Execute ISP program "Mstar ISP Utility" and then click
"Config" tab.
(2) Set as below, and then click "Auto Detect" and check "OK"
message.
If "Error" is displayed, Check connection between
computer, jig, and set..
(3) Click "Read" tab, and then load download file (XXXX.bin)
by clicking "Read".
(4)
filexxx.bin
(4) Click "Connect" tab. If "Can't" is displayed, check
connection between computer, jig, and set.
(2)
OK
(5) Click "Auto" tab and set as below
(6) Click "Run".
(7) After downloading, check "OK" message.
(5)
filexxx.bin
(1)
(3)
Please Check the Speed :
To use speed between
from 200KHz to 400KHz
(6)
(8) ..........OK
(7)
LGE Internal Use Only

Advertisement

loading

This manual is also suitable for:

26lv2500