3.4.
3.4.1.
3.4.2.
E 3-2
BRIEF
CHECKING
PROCEDURE
General
The purpose of this operation is to check the functions of the PM 5191 with the least amount of time
and effort.
It is assumed that the operator is familiar with the PM 5191 and its characteristics. If the test is carried
out shortly after being switched on, the individual testing steps could lead to incorrect results owing to
the warming-up time being inadequate.
WARNING:
Before switching on ensure that the equipment has been put into operation in accord-
ance with chapter 2.
Operations Test
Immediately
upon
being switched
on, a self-test is carried out. The instrument then automatically
returns to its basic status (see chapter 3.3.). The equipment's last operational status prior to being
switched off is displayed. Using key |ENTER|
execute this setting.
If you prefer a different operation mode, then just input new parameters.
example:
wave form
sine
frequency
150 Hz
modulation
off
ievei:
amplitude (Vpp)
iv
DC offset (Vdc)
OV
—
Earlier settings that remain unchanged do not need to be entered again.
OFF
modulation
level
Eo
[eo] fee
*(press key Hz/kHz only if LED "Hz'' doesn't lit)
—
connect the oscilloscope to socket OUTPUT
(see chapter 3.5.2.1.) (Zo = 50 ohm) and check the
signal. If it is correct, the operations test is finished. If not, repeat the procedure with other settings.
For input examples see the concise form of the operating instructions ''Operating Card'' and chapter
3.5.