Perform Monthly Test (H1); Disable Or Re-Enable (H2) - Panasonic EBL512 User Manual

Hide thumbs Also See for EBL512:
Table of Contents

Advertisement

6. PERFORM MONTHLY TEST (H1)

a) Log on to the c.i.e.
b) Menu H1 is selected. Press
c) Press
. The c.i.e. buzzer sounds, all the dots in the display are shown and all LEDs on the front are turned on. If the
c.i.e. has a printer it has made a print out: ABC..........Z abc.........z.
d) Press
. Up to four zones can be set in test mode. Use the keypad to type the zone numbers.
e) Press
.
f) Perform the test.
g) To end the test, press
Some national regulations also require a routine test of the routing equipment.
If the routing equipment shall not be tested, the monthly test is completed. Press
If the routing equipment shall be tested, press
Started test is indicated by LED "Fault tx activated" and after 30 seconds also LED "Fire brigade tx".
After 60 seconds in total, the routing equipment test is ended and the LEDs are turned off. Press

7. DISABLE OR RE-ENABLE (H2)

a) Log on to the c.i.e.
b) Navigate to menu H2.
c) Press
. A sub menu list (B1 – B6) will be displayed.
.
.
to highlight
and press
.
YES
10
.
.

Advertisement

Table of Contents
loading

Table of Contents