Download Print this page

Haier GE NAMP1 Installation Instructions Manual page 6

One-piece psc air handler

Advertisement

Left-Hand Air Discharge
Figure 4.
1.
2.
drain pan.
3.
horizontal drain pan and reinstall them on front holes.
IMPORTANT
to verify that drain opening is fully open and free of any
fallen into the drain pan during installation that may plug
up the drain opening.
4.
TOP CAP ROTATED TO
CORRECT POSITION
CABINET
SUPPORT
BEND
DRAIN PAN
REINSTALLED
HERE
REINSTALLED HERE
COIL SHOWN IN UPFLOW POSITION FOR EASY
CONVERSION (LEFT-HAND AIR DISCHARGE)
Page 6 of 22
FRONT EDGE OF HORIZONTAL
DRAIN PAN
TOP CAP
SCREWS
90º
DRIP
SHIELD
———— DRAIN PLUGS ————
REMOVED FROM HERE
FRONT VIEW
DETAIL A
Figure 5.
6.
7.
8.
other. The 90º bend must be on the same side as
the horizontal drain pan as illustrated in Detail A in
NOTE:
9.
support rail as illustrated.
NOTE:
10.
11.
12.
3/16" PLASTIC
PLUG (REAR COIL
END SEAL)
DRIP SHIELD
SCREW (FRONT
COIL END SEAL)
DRAIN PAN
SHIPPING
LOCATION
INSTALL DRAIN PAN
BETWEEN TAB AND
EXTERIOR INNER WALL.
TOP CAP
DETAIL B
90º
BEND
Issue 2336
DETAIL C
ALIGN HOLES WITH
HOLES IN COIL END
PLATE. STARTING WITH
THE ROUND HOLES ON
THIS END.
BACK COIL
END SEAL
507787G02 / 31-5000675-1

Advertisement

loading