When evaluating ceiling you must take into account the following mounting information:

3.4.1 Rail Mounting

Attach stationary rails to structural steel with through-bolts in concrete ceilings. Do not use
screw anchors in direct tension.
Mount stationary rails directly to the ceiling slab or to flush–mounted unistrut or halfen
structure. In higher rooms with false ceiling, mount stationary rails to rigid vertical members
hung from ceiling slab.
Securing a supplementary channel to the bottom of the vertical members and mounting the
stationary rails to this channel can greatly reduce the number of vertical members.
The stationary rail support structure must be leveled before installation can begin. Do not
assume that any support structure is level within specified tolerances, particularly after
removing suspensions from an existing room.

3.4.2 Bolt Specifications

The maximum load per bolt will not exceed 1557 N.
Each bolt must not "pull out" or otherwise fail under a vertically downward dead
load of 6227 N.

3.4.3 Select Rails

All XT Stationary rails are with a select length process. Detail of available length is illustrated
in
Chapter 7, Section 4,
Chapter 3 Physical Requirements of Room
European Process Order Select.
Direction 5314528-2-1EN, Revision 1
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova 3100Innova 3100-iqInnova 4100Innova 4100-iq

Table of Contents