Equipment Required; Adjustment Procedure - Sanyo JJ-P4 Service Manual

Stereo cassette player
Table of Contents

Advertisement

ADJUSTMENT PROCEDURES
GENERAL REMARKS
,
|
@
Before adjusting the mechanism of this unit, wipe the tape
@
This model features the Auto Reverse Mechanism. Then the
contacting surfaces clean as well as the contacting surfaces
tape transport direction is distinguished as follows:
of the driving parts with a cotton swab or a soft cloth soaked
= FORWARD DIRECTION:
in alcohol. Trouble may occur because of oil and grease
The tape is wound counter-clockwise.
stains.
= REVERSE DIRECTION:
|
The tape is wound clockwise.
@
Handie the belt carefully the because grease easily attaches
_
z
se
|
to it. Then check the used rubber parts. If the rubber has
@
When performing the adjustment while sieve pack the test
deteriorated or is scratched, replace the parts with new one.
tape, set the tape transport to the FORWARD DIRECTION.
EQUIPMENT REQUIRED
|
|
@
FrequencyCounter
|
,
7
-_
@
Alignment Tool
@
Dualtrace Oscilloscope
,
|
-
NOTE:
e VTVM (2 sets)
O O
Before the Adjustments, set the control and switch as follows:
@
Dummy Load (160) -
|
|
=.
m . Dolby NR Switch ................... a u l a ascadaswastenacedaet OFF
@
TestTapes
|
|
=
VolumeControl ...... eh Ee nee Poe ae ..... AS desired
° 3kHz test tape (Example: TEAC MTT- 111)
=
Supply the regulated DC 1 BV power to the Ext. Power Jack
es
10kHz test tape (Example: A: BEX TCC-1 53)
for the adjustment.
ADJUSTMENT PROCEDURE
Adjustment
Dummy |
_ Measuring
_ Measuring
Reverse Side

Advertisement

Table of Contents
loading

This manual is also suitable for:

142 473 26142 473 27142 473 28

Table of Contents