Commissioning
Pre- commissioning inspections
After installation of the bay, completion of all earth circuit and electrical con-
nections, it is necessary to perform certain pre- commissioning inspections.
These inspections should be performed with the apparatus ready to be com-
missioned (energized), in other words
S LV electrical circuits conforming, in voltage and type, with the low- voltage
diagrams and rating plate of the apparatus.
S SF
or SF
+CF
envelopes at rated SF
6
6
4
NOTE : Rated pressure, pressure of equipment after SF
gas filling.
S Flexible connections linking circuit- breaker to busbar installed.
DURING OPERATIONS REQUIRED AS PART OF INSPECTION PRO-
GRAMME PRIOR TO COMMISSIONING, ALL POSSIBLE SAFETY PRE-
CAUTIONS SHOULD BE TAKEN TO PROTECT PERSONNEL WORK-
ING ON THE EQUIPMENT.
This module contains the following checking inspections :
Pole/operating device coupling sleeve
Orientation and identification of interrupting chambers
SF
or SF
+CF
gas
6
6
4
Operating device
Finish and test operations
May we remind you that the Test Report prior to Commissioning
Enclosed with this notice absolutely must be completed.
It must be filled in, dated, signed and sent back
within two weeks following the tests to
Failing a return of the report within the allowed deadline,
the warranty for the switchgear cannot be taken into
account and the customer's liability may be pursued.
* There may be several RES
GE Information
or SF
6
Inspections
RES
M *
* * *
Grid Solutions SAS
Service Contrats
21 rue Cyprian
69611 Villeurbanne
FRANCE
+CF
pressure.
6
4
or SF
+CF
6
6
Page
2
3
4
5
6
L34- 011EN/09
1/6
4

Advertisement

Table of Contents
loading

Table of Contents