3.4. Storage

The units must be stored in vertical
position on a smooth surface.
 Minimum
ambient temperature as per
CT specification.
NOTE: The units stored outside in
vertical position must be screwed on to
the ground, even if the storage is
foreseen for a short period of time.

4. ASSEMBLY IN THE STRUCTURE

The transformer shall be set up in
vertical position.
It is very important that the surface on
which the CT will be set up is flat
(tolerance for no more than 1mm).
Verify if the four feet are supported on
the structure. If not, it is necessary to
insert a shim before putting the fixation
screws.
Remove the lower lid of black plastic, if
applicable, from secondary terminal box.
© GE Grid Solutions
and
maximum
It is only used for transport. It cannot be
used as tube guide.

5. CONTACT SURFACES PREPARATION

It is recommended to clean all aluminum
contact surfaces with sandpaper 150
grain in order to eliminate the oxidation
layer. Scrub the contact surfaces with a
metallic brush (diameter of the thread
0.3mm) and impregnate with grease of
the type "PENETROX" or equivalent. All
the surfaces must be completely
covered with grease.
For silver or tinned contacts, only clean
(do not use sandpaper) and polish the
side of the aluminum. Cleaning silver or
tinned surfaces with sandpaper could
cause damage to the protection layer.

6. CONNECTIONS

6.1. Primary Terminals

Connect the high voltage cable, or tube,
to
the
primary
appropriate connectors so that they
assure a good contact.

6.2. Primary bar type (if applicable)

Primary
bar
completely
assembled
delivered CT. Clean the primary terminal
as explained in "CONTACT SURFACES
PREPATION"
terminals
with
is
always
supplied
with
the
8

Advertisement

Table of Contents
loading

Table of Contents