Page 1
The following information updates your Dell PowerVault 20xS Storage System Installation and Service Guide . The rack kit includes the following items: Two support rails Two adjustable rail mounting flanges Two mounting ears, usually preinstalled if you ordered a rack-mounted system...
Page 2
If the two adjustable rail mounting flanges are not already attached to the support rails, attach one flange to one of the support rails using two 10-32 x 1/2-inch Phillips-head screws, as shown in Figure 1. Do not tighten the screws at this time.
Page 3
Slide the adjustable rail mounting flange out until it meets the rear vertical rail of the rack. Ensure that the rail is level from front to back. Thread two 10-32 screws with a flat washer and a square alignment washer and push them through the rear vertical rail of the rack and into the two holes of the adjustable rail mounting flange (see Figure 3).
Page 4
Reproduction in any manner whatsoever without the written permission of Dell Computer Corporation is strictly forbidden. Trademarks used in this text: Dell , the DELL logo, and PowerVault are trademarks of Dell Computer Corporation. Other trademarks and trade names may be used in this document to refer to either the entities claiming the marks and names or their products.