Venting Requirements; Follow - Kenmore 9787 - Elite HE3 7.0 cu. Ft. Gas Dryer Installation Instructions Manual

27" (69 cm) gas laundry center
Hide thumbs Also See for 9787 - Elite HE3 7.0 cu. Ft. Gas Dryer:
Table of Contents

Advertisement

Available languages

Available languages

Alternate
installations for close clearances
Venting systems come in many varieties. Select the type best for
your installation. Three close-clearance
installations are shown.
Refer to the manufacturer's
instructions
provided with the vent
system.
A. Loop system with standard elbows
B. Loop system with one offset and one standard elbow
C. Vent system with one periscope
(2" [5 cm] clearance)
NOTE: The following kits for close clearance alternate
installations are available for purchase. To order, please call
1-800-4-MY-HOME
®(1-800-469-4663).
Over-the-Top
Installation:
Part Number 26-49900
Periscope Installation (For use with dryer vent to wall vent
mismatch):
Part Number 26-49901 - Less than 5" (12.7 cm) mismatch
Part Number 26-49908 - 5" (12.7 cm) to 18" (45.7 cm)
mismatch
Part Number 26-49904 - 18" (45.7 cm) to 29" (73.7 cm)
mismatch
Part Number 26-49905 - 29" (73.7 cm) to 50" (127 cm)
mismatch
Special provisions for mobile home installations
The exhaust vent must be securely fastened to a noncombustible
portion of the mobile home structure and must not terminate
beneath the mobile home. Terminate the exhaust vent outside.
%
Determine
vent path
Select the route that will provide the straightest and most
direct path outdoors.
Plan the installation to use the fewest number of elbows and
turns.
When using elbows or making turns, allow as much room as
possible.
Bend vent gradually to avoid kinking.
Use the fewest 90 ° turns possible.
Determine
vent length and elbows needed for best
drying performance
Use the Vent system chart below to determine type of vent
material and hood combinations
acceptable to use.
NOTE: Do not use vent runs longer than those specified in
the Vent system chart. Exhaust systems longer than those
specified will:
Shorten the life of the dryer.
Reduce performance, resulting in longer drying times and
increased energy usage.
The Vent system chart provides venting requirements that will
help to achieve the best drying performance.
Vent system chart
NOTE: Side exhaust installations adds a 90 ° turn inside the
laundry center. To determine maximum exhaust length, add one
90 ° turn to the chart.
Number of
Type of Vent
Box or
Angled
90 ° turns
Louvered
hoods
or elbows
hoods
0
Rigid metal
37 ft (11.3 m)
35 ft (10.7 m)
Flexible metal
25 ft (7.6 m)
20 ft (6.1 m)
1
Rigid metal
32 ft (9.7 m)
27 ft (8.2 m)
Flexible metal
21 ft (6.4 m)
16 ft (4.9 m)
2
Rigid metal
24 ft (7.3 m)
19 ft (5.8 m)
Flexible metal
15 ft (4.6 m)
10 ft (3.0 m)
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

9787 he3 7.0

Table of Contents