HP D5970A - NetServer - LCII Reference Manual page 37

Rack cabling reference guide
Hide thumbs Also See for D5970A - NetServer - LCII:
Table of Contents

Advertisement

Chapter 3
HP NetServer
LC 2000r
Figure 3-1. Overview of Data Cabling of the HP NetServer LC 2000r to an HP
NOTE
Figure 3-1 shows an HP Console Switch, which is not
necessary for configuring the system, but is shown for
informational purposes.
NOTE
The configuration in Figure 3-1 requires 1 UPS and 1 PDU at
120 V, 200/208 V, and at 220/230/240 V.
For 100 VAC applications, a 3000 VA UPS is required and 2
PDUs must be in place.
Procedure for Connecting and Routing Cables to the LC 2000r
Single Bus
Configured
Storage
Dashed Lines Indicate Dual Bus
Configured Storage
Rack Storage/12
Rack Storage/12