Download Print this page

HP StorageWorks 2000fc - G2 Modular Smart Array Installation Instructions

Hp storageworks carrier-grade enclosure installation instructions (589728-001, november 2009)
Hide thumbs Also See for StorageWorks 2000fc - G2 Modular Smart Array:

Advertisement

Quick Links

HP StorageWorks
Carrier-Grade Enclosure
installation instructions
This document provides specific information regarding
the carrier-grade versions of the HP StorageWorks
Dual I/O 2.5" DC-power Drive Enclosure.
© Copyright 1999, 2009 Hewlett-Packard Development Company,
L.P.
First edition: October 2009
The information in this document is subject to change without notice.
Printed in the US
www.hp.com
*589728-001*
Cable information
This section provides cabling information for installing the HP
StorageWorks Dual I/O 2.5" DC-power Drive Enclosure.
NOTE:
This carrier-grade product is intended for use in both common
bonding networks and isolated bonding networks.
NEBS chassis ground
There are two grounding methods that can be used when installing the
HP StorageWorks Dual I/O 2.5" DC-power Drive Enclosure:
Using a single wire coming from the front of the chassis ears
Using a cable from the power supply
Installation and grounding instructions — single wire method
1.
Attach the rear brackets to the Carrier-Grade Enclosure.
2.
Attach the left bracket assembly to the left rack rail.
3.
Attach the right bracket assembly to the right rack rail.
4.
Insert cage nuts into the rack holes.
5.
Align the Carrier-Grade Enclosure with the rails, and then slide it
into the rack until the ears of the enclosure are about 1 to 2 inches
from the rack front rails.
6.
Attach a flat washer between the right mounting ear (bottom hole)
and the rack, and then loosely attach the bracket to the rear bracket
assemblies.
Page 1

Advertisement

loading

Summary of Contents for HP StorageWorks 2000fc - G2 Modular Smart Array

  • Page 1 Using a cable from the power supply Installation and grounding instructions — single wire method Attach the rear brackets to the Carrier-Grade Enclosure. © Copyright 1999, 2009 Hewlett-Packard Development Company, L.P. First edition: October 2009 The information in this document is subject to change without notice.
  • Page 2 Attach the single-hole ground cable lug between the front right mounting ear (top hole) and the rack with a lock washer and screw. Figure 1 DC power cable with D-Shell connector for connecting to a power-and-cooling module and three lugs for connecting to a DC power supply Verify that both power switches are off.
  • Page 3: Preventing Electrostatic Discharge

    CAUTION: NOTE: The intra-building ports of the equipment are suitable for For more information on static electricity, or assistance with connection to intra-building or unexposed wiring or cabling product installation, contact your HP authorized reseller. only. The intra-building ports of the equipment MUST NOT be metallically connected to interfaces that connect to the Outside Plant (OSP) or its wiring.

This manual is also suitable for:

Storageworks 2000sa - g2 modular smart array