Installation Tools Requirements
Type
Tools
Common
Claw hammer,
Tools
pliers
Phillips-head
screwdriver,
straight
screwdriver,
spanner
Power supply
cables,
network
cables, optical
fibers and
distribution
cables
Ruler, long
tapeline,
marker pen
Bolts, diagonal
pliers, straps
Special
Anti-static tool
purpose
tools
Wire stripper,
crimping pliers
Meter
Multimeter
500V
Megohm-
meter
Table 3. Required Tools
Installation Site
Requirements
The DGS-6604 must be used indoors. To
ensure the normal operation and prolonged
useful life of the equipment, the installation
site must meet the following requirements.

Requirements for Rack Mounting

If you plan to mount the DGS-6604 in a frame,
please observe the following guidelines:
Remarks
Unpack wooden
case and
transportation case.
Disassemble
chassis, power
supply, fan and
modules
Connect the
interfaces.
Measure the
installation position.
Mount the chassis.
Prevent static
electricity.
Create network
cables and
grounding cables.
Test power supply
and DC resistance.
Test the insulation
and grounding
resistance
Install the switch in an open cabinet if
pos sible. If you install the switch inside
a closed cabinet please ensure that the
cabi net has a good ventilation and heat
dissipation system.
Ensure that the cabinet is durable enough
to bear the weight of the DGS-6604 and its
installation accessories.
Ensure that the dimensions of the cabinet
provide enough space for the installation
of the front, rear, left and right panels of
the DGS-6604 for the purpose of heat
dissipation.
The frame should be properly grounded.

Ventilation Requirements

Following figure shows the ventilation
requirements of the DGS-6604. You must
reserve sufficient space near the vents to
ensure proper ventilation. After the cables
have been connected, they should be
arranged into bundles or placed on the cabling
rack to prevent the obstruction of air intakes
and vents.
Figure 3. Ventilation of the DGS-6604
Mounting the DGS-6604 into the Cabinet
1. Lift the chassis (seek assistance if the
chassis is more then you can lift safely)
while keeping it level Slowly move it to the
front of the frame.
2. Keeping the DGS-6604 level, lift it to a
posi tion slightly higher than the tray of the
slide rail of the cabinet. Set the chassis
onto the tray or the slide rail, and push it
into the cabinet.
3. Fasten the DGS-6604 to the cabinet with
screws. Fastening notches are on both the
left and right sides of the front panel on the
D-Link DGS-6604 Modular Switch u 5