An Accessorg Storage Drawer) - GE Advantium PSB1200 Installation Instructions Manual

120v built-ln speedcook ovens
Hide thumbs Also See for Advantium PSB1200:
Table of Contents

Advertisement

Installation Preparation
PreparationWITHOUTan AccessorgStorageDrawer
PREPARE THE OPENING {cont.)
Installation over a GE/Monogram
oven:
17-1/2"
Construct Solid
Bottom Min.
3/8" Plywood
Supported by
x4or2x2
Runners all
Four Sides
2" Min.
(3" Recommended)
Per Oven
Requirement
• If Uou are replacing a GE/IVlonogram
electric
double oven with the combined
installation
of an Advantium
12OV and a single oven, use
the dimensions
shown. The middle rail separating
the two openings
may need to be larger than
the 2" minimum
shown.
PREPARE THE OPENING
{cont.)
Installation
over a GE/Monogram
Oven and
Warming
Drawer:
23-1/2"
PerWarming
Drawer Requirement
ConstructSolid
Bottom Min.
3/8" Plywood
Supportedby
_2x4or2x2
Runnersall
FourSides
2" Min.
(3" Recommended)
Per Oven
Requirement
Min.
(3" Recommended)
NOTE: Additional
clearances
between the cutouts
may be required. Check to be sure the oven
supports
above the Warming
Drawer location
do not obstruct the required interior depth
and height. See Warming
Drawer installation
instructions
for details.
-&CAUTION: For
p ersonal safety,
the
mounting
surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate
80-pound
oven, plus
additional
oven loads of up to 50 pounds
or a total weight of 1:30 pounds.

Advertisement

Table of Contents
loading

Table of Contents