Download Print this page

GE DNCD450GG0WC Installation Manual page 11

Hide thumbs Also See for DNCD450GG0WC:

Advertisement

Installation
[]
RECONNECTING
GAS
Listed
connector
ANSI Z21.24
/ CSA 6.10
118" NPT PIPE
NEW METAL
PLUG FOR
GAS
FLEXIBLE G AS
INLET PRESSURE
LINECONNECTOR
ADAPTER
ELBOW
3/8" NPT
SHUT-OFF
PIPE SIZE
ITEMSNOT SUPPLIED
--AT
LEAST I/2"
Note:
The connector
and fittings
are designed
for use only
on the original
instaUation
and are not to be reused
for
another
appUance
or at another
tocation,
Keep flare
end of
adaptor
free
of grease,
oil and thread
seal.ant,
Caution:
Use adapters
as shown.
Connector
nuts must
not
be connected
direcNy
to pipe threads.
APPLYPIPECOMPOUND
TO THEADAPTERAND
DRYER GASINLET.
\
TIGHTEN THE FLEXIBLE
GAS LINE USING TWO
ADJUSTABLE WRENCHES.
Instructions
APPLYPIPECOMPOUND
TOALL MALETHREADS.
3
©
TIGHTEN ALL CONNECTIONS
USING TWO ADJUSTABLE WRENCHES.
DO NOT OVERTORQUE GAS CONNECTIONS!
[] LEAK TEST
,_
WARNING
- NEVER USE AN OPEN
FLAME TO TEST FOR GAS LEAKS.
OPEN
GAS VALVE,
Check all connections
for leaks with soapy solution or equivalent.
Apply soap solution.
Leak test solution
must not contain
ammo-
nia which could ceuse damage
to the brass fittings.
If leaks are
found, close valve, retighten the joint, and repeat the soap tesL

Advertisement

loading