HP Cluster Platform Hardware Kits v2010 Installation Manual page 6

Myrinet interconnect rack kit installation guide
Hide thumbs Also See for Cluster Platform Hardware Kits v2010:
Table of Contents

Advertisement

Figure 3: Attaching the Rail to the Rack Columns
Rear Left
Column
1.
Locate the marked mount location.
2.
Clip a cage nut into the back of the middle and top holes of both the front and
rear columns, using a total of four nuts.
3.
Using a #1 Phillips screwdriver, secure the rail to the rack columns with a
M6 x 16-mm pan-head screw.
4.
Repeat steps 1–3 for the right rail.
8 Installing the Retainer Brackets
Attach the retainer brackets to the interconnect chassis as shown in Figure 4.
_______________________
Use only the specified screws. Screws that are too long might penetrate
the switch chassis and damage internal components.
4
Myrinet Interconnect Rack Kit Installation Guide
M6 Cage
M6 x 16MM
Nut
CAUTION
Front Left
Colum
_______________________

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

10642 rack

Table of Contents